2608
|
Wednesday, June 12, 2024, 10:18 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is moved from TCS to silo this morning | TM2 is moved from TCS to silo this morning.
The move is smooth. |
|
2607
|
Monday, June 10, 2024, 11:02 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW.
Doc # 181007 |
|
2606
|
Wednesday, June 05, 2024, 11:32 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system filters have been changed. | TCS water system five filters were
changed yesterday by plant group Dan.T. Service
labels on filters are updated. No water |
|
2605
|
Wednesday, June 05, 2024, 11:25 |
David Wang | Conditioning Station | Standard Operation | | | refilled TCS:TK2 to 27.4 inches. | refilled TCS:TK2 to 27.4 inches to compensate
water lost during THC filters change. |
|
2604
|
Tuesday, June 04, 2024, 11:44 |
Carla Babcock | South Hot-Cell | Development | | empty LP FEBIAD | investigation of cathode short on empty LP FEBIAD | On May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source |
|
2603
|
Thursday, May 30, 2024, 11:08 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 was moved from silo to TCS yesterday morning. | TM2 was moved from silo to TCS yesterday
morning. The move is smooth.
TCS vacuum system was started after. TCS |
|
2602
|
Tuesday, May 28, 2024, 13:49 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | Module Connection | TM4 with new target UCx#45 was connected
in ITW this morning. pls see attachment uploaded
with. |
|
2601
|
Tuesday, May 28, 2024, 10:13 |
David Wang | ITW | Standard Operation | TM4 | UCx#45 | Tm4 has been moved from TCS to ITW. | Tm4 has been moved from TCS to ITW.
the move is smooth. |
|
2600
|
Tuesday, May 28, 2024, 07:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx#45 | TCS was argon vented this morning between 6:00 and 7:30am. | TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW. |
|
2599
|
Friday, May 24, 2024, 08:10 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#45 | UCx#45 Installation | On Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin |
|
2598
|
Thursday, May 23, 2024, 11:10 |
David Wang | MAA | Standard Operation | | | BL2A MAA ASU test. | MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept the test document. |
|
2597
|
Thursday, May 23, 2024, 10:59 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | shielding blocks transfer | the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery. |
|
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. | electrical check and leak check were done
on TM4 UCx#45 target at SHC. everything
is ok. See attachment |
|
2595
|
Wednesday, May 22, 2024, 12:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. the
move is smooth. |
|
2594
|
Tuesday, May 21, 2024, 11:46 |
David Wang | ITW | Standard Operation | TM4 | LP febiad empty. | Tm4 has been moved from ITW to SHC. | Tm4 has been moved from ITW to SHC. the
move is smooth. |
|
2593
|
Tuesday, May 21, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | Lp Febiad empty | Tm4 has been disconnected in ITW. | Tm4 has been disconnected in ITW per document
141576. Checklist is done. HS line
is purged. |
|
2592
|
Wednesday, May 15, 2024, 10:06 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38,40 Ta#62,63 SiC#44 | Targets moved to the mini vault. | Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308 |
|
2591
|
Tuesday, May 14, 2024, 15:27 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | TM3 conditioning and testing in ITE | Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV |
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|
2589
|
Friday, May 10, 2024, 09:04 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been connected in ITE. | Tm3 has been connected in ITE. see
attachment. |
|