ID Date Author Category Type Module Target/Number Subject Text Attachments
  2598   Thursday, May 23, 2024, 11:10 David WangMAAStandard Operation  BL2A MAA ASU test.MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery.
  
  2596   Wednesday, May 22, 2024, 12:43 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check and leak check were done on TM4 UCx#45 target at SHC.electrical check and leak check were done
on TM4 UCx#45 target at SHC.  everything
is ok. See attachment
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2595   Wednesday, May 22, 2024, 12:32 David WangSouth Hot-CellStandard OperationTM4UCx#45TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. the
move is smooth. 
  
  2594   Tuesday, May 21, 2024, 11:46 David WangITWStandard OperationTM4LP febiad empty. Tm4 has been moved from ITW to SHC.Tm4 has been moved from ITW to SHC. the
move is smooth. 
  
  2593   Tuesday, May 21, 2024, 09:50 David WangITWStandard OperationTM4Lp Febiad emptyTm4 has been disconnected in ITW.Tm4 has been disconnected in ITW per document
141576. Checklist is done.  HS line
is purged.
 TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf 
  2592   Wednesday, May 15, 2024, 10:06 Travis CaveSpent Target VaultStandard Operation UC#38,40 Ta#62,63 SiC#44Targets moved to the mini vault. Targets UC#38,40 Ta#62,63 SiC#44
have been moved from the spent target vault
to the mini vault in preparation for F-308
 Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf 
  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITETuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV
 Screenshot_from_2024-05-14_10-47-22.png 
  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. 
  
  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE. Tm3 has been connected in ITE.  see
attachment.
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2588   Thursday, May 09, 2024, 13:52 Riley SykesWaste Package/ShipStandard Operation  F308 Service/Inspection F308 Inspection and service complete
on #06, #08, #13, #15, #16, #19, #20, #21,
#22.
  
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually.
  
  2586   Wednesday, May 08, 2024, 12:37 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form TCS to ITEThe move is smooth and successful.   
  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE.
  
  2584   Tuesday, May 07, 2024, 12:39 Eric LaheSpent Target VaultRepair  ISAC Storage Vault Re-alignment 
 Testing_and_updates_to_storage_vault_2024-05-01.pdf 
  2583   Tuesday, May 07, 2024, 09:47 David WangITE/ITWMaintenanceTM2 Broken TM2:TP2 has been replaced. Broken TM2:TP2 has been replaced otday
by a new TV-1001 nav pump supplied by vacuum
group. replaced pump seris number:201281.
  
  2582   Friday, May 03, 2024, 12:20 Travis CaveSpent Target VaultStandard Operation Ta#66Target repacked The Ta#66 target was repacked after
the parasitic target was removed it was place
in a new pail (#290) and place back in spot
 Target_Index_2024-05-03.pdf 
  2581   Thursday, May 02, 2024, 18:48 Carla BabcockITWStandard Operation  ITW cage setupITW gas lines pumped down to 2e-3Torr on
leak detector with leak rate in the low e-7
atm-cc/s. Gas bottles opened at 3psi and
  
  2580   Thursday, May 02, 2024, 15:23 David WangSouth Hot-CellDevelopmentTM3 Leak check on TM3 new containment box window line VCR fittings. After new containment box installation
on TM3, Chad and I did a helium spray leak
check on two VCR fittings on front side water
  
  2579   Thursday, May 02, 2024, 14:58 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 with UCx#44 electrical check and leak check.TM3 with UCx#44 electrical check and leak
check are good. see attachment.
HS line 70 psi helium pressure test
 Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf 