  2428   Thursday, March 30, 2023, 14:29 Frank SongITE/ITWDevelopment  Preparation of target stations for FEBIAD runsHelium cylinder and  Argon cylinder
are installed in both ITE/ITW faraday cages
, regulator for outlet pressure are not set
 1_(5).png1_(2).png 
  2427   Monday, March 13, 2023, 11:25 Carla BabcockITE/ITWDevelopment  10kOhm resistors installed in ITE/ITW faraday cagesOn Sept. 14 2022, a 10kOhm 30W resistor
was installed in each target station faraday
cage, in line with the HV bias supply. This
 ITE_ITW_BIASresistor.docx 
  2426   Wednesday, March 08, 2023, 13:57 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 pump and motor temerature measurementsHALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging  port:
  
  2425   Wednesday, March 08, 2023, 09:19 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 motor phase current measurement. HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A. 
MP2: 17.9A/17.9A/17.3A.   19.5A
  
  2424   Wednesday, March 08, 2023, 06:32 David WangCoolingMaintenance  HALCW flow sensors replacement. HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and
  
  2423   Tuesday, March 07, 2023, 10:37 chad fisherNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair


   
        
            
  
  2422   Monday, March 06, 2023, 11:31 Adam NewsomeNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator RepairThe linear actuator used for the Y-motion
motor assistance on the spare telemanipulator
was replaced and tested. It was observed
  
  2421   Wednesday, March 01, 2023, 10:01 David WangITE/ITWDevelopment  vacuum pit ventilation upgrade. vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling  fans.  One
  
  2420   Wednesday, March 01, 2023, 09:34 David WangCoolingMaintenance  Visual inspection of HALCW for possible small water leak or drip. I visually inspected HALCW system including
water station section, both target pits,
and de-ionizer system.  No small leak
  
  2419   Wednesday, March 01, 2023, 09:27 David WangCoolingMaintenance  Two filters on HALCW resin circuit have been replaced. Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses.  25micron 
  
  2418   Wednesday, February 22, 2023, 09:22 Carla BabcockITE/ITWStandard Operation  HV testing of ITE/ITWFeb. 16 2023: HV tests done on ITE station.
Ramped up to 59kV but was not stable there,
current draw was very unstable and was sparking
 Screenshot_from_2023-02-16_13-19-44.pngScreenshot_from_2023-02-22_09-20-14.pngScreenshot_from_2023-02-24_17-41-33.png 
  2417   Tuesday, February 14, 2023, 11:36 David WangAssembly/Bench TestRepair  Turbo pump BVs o-ring replacement. Five of used  internal leaked 
TP BVs are serviced and repaired. Internal
plunge  o-ring and case o-ring are replaced
  
  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit. In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked.  ITW BV1 and BV2
  
  2415   Monday, January 30, 2023, 11:30 Travis CaveSpent Target VaultStandard Operation UC#41Spent Target Move The spent UC#41 was moved from the
south hot cell to the spent target vault,
placed in spot 1C, in pail #231. See attached
 Target_Index_2023-01-30.pdf 
  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and  plates ITA6550-01
yesterday. He certified the use of these
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss  finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file.
  
  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has
  
  2410   Wednesday, January 25, 2023, 06:52 David WangITEStandard OperationTM4UCx#41ITE primary and secondary vacuum vessel air to vacuum seals leak check. ITE primary and secondary vacuum vessel
air to vacuum seals leak check was done this
week. One leak has been found on IG1S feed
 ITE_vacuum_vessel_leak_check_2023..pdf 
  2409   Tuesday, January 24, 2023, 14:22 David WangSouth Hot-CellStandard OperationTM4UCx#41TM4 electrical check with and without target at SHCTM4 electrical check with UCX41target and
without target at SHC.  The results
are good. See attachment.
 TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf 