ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
2341
|
Tuesday, June 28, 2022, 14:13 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | Module Connection | TM4 with Ta#64 was connected in ITE.
see attachment please. |
|
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
|
2339
|
Thursday, June 23, 2022, 10:22 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#37 | Spent Target Move | UC#37 was placed in pail #228 and
place in spot 1B it was removed the north
hot cell. See attached PDF for more details |
|
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check | New Target Ta#64 was installed on
TM4. Electrical measurement result is good.
c/w attachment. |
|
|
2337
|
Wednesday, June 22, 2022, 09:14 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC#42 and SiC#43. | Three of TM2 moves related to SiC#42 to SiC #43 target switching job. | Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target |
|
|
2336
|
Wednesday, June 22, 2022, 09:03 |
David Wang | ITE | Standard Operation | TM4 | UCX37# P2N | Remotely removed TM2 from ITE to NHC | TM2 with UCx#37 P2N target was removed
from ITE to NHC yesterday morning. The move
is good. |
|
|
2335
|
Tuesday, June 21, 2022, 18:43 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check | A p2n target in TM4 was electrical
measured on NHC. see attachment pls. |
|
|
2334
|
Tuesday, June 21, 2022, 18:30 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | Module Connection | TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. |
|
|
2333
|
Tuesday, June 21, 2022, 17:49 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | TM4 disconnection | the module with target UCx37 was
disconnected in ITE. |
|
|
2332
|
Tuesday, June 21, 2022, 15:36 |
Matthew Gareau | North Hot-Cell | Repair | TM2 | SiC#42, SiC#43 | multipin guide pin issues | While removing the SiC#42
it became apparent that the multipin guide |
|
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check | TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment. |
|
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC | An electrical check was done at NHC,
see attachment pls. |
|
|
2329
|
Thursday, June 09, 2022, 09:47 |
Matthew Gareau | South Hot-Cell | Repair | TM2 | SiC#42 | containment box repair, Einzle lens, multi pin | On June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to |
|
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection | TM2 with Febiad target SiC#42 was
connected in ITW. |
|
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections | An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. |
|
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection | TM2 with a test target was disconnected
in ITW. |
|
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
|
2324
|
Wednesday, May 25, 2022, 10:23 |
Nadia Jorgenson | Spent Target Vault | Repair | | | F-308 Loading, Mini-Storage Vault Failure | 5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the |
|
|
2323
|
Thursday, May 19, 2022, 15:05 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | UCx#37 P2N connection on TM4 | TM4 with UCx#37 was connected in
ITE. Attachment available. |
|
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
|