2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection | TM2 with Febiad target SiC#42 was
connected in ITW. |
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections | An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. |
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection | TM2 with a test target was disconnected
in ITW. |
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
2324
|
Wednesday, May 25, 2022, 10:23 |
Nadia Jorgenson | Spent Target Vault | Repair | | | F-308 Loading, Mini-Storage Vault Failure | 5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the |
|
2323
|
Thursday, May 19, 2022, 15:05 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | UCx#37 P2N connection on TM4 | TM4 with UCx#37 was connected in
ITE. Attachment available. |
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
|
2321
|
Wednesday, May 18, 2022, 13:52 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check | The TM4 with installed target #UCx37
had been electric checked at SHC. PICs attached. |
|
2320
|
Wednesday, May 11, 2022, 16:29 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault | An
inspection was performed on drive systems
for the main storage vault by Dan McDonald, |
|
2319
|
Wednesday, May 11, 2022, 16:15 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close
mechanism for the Storage Vault door was |
|
2318
|
Friday, May 06, 2022, 10:12 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Mini-Storage Vault | The annual inspection of the mini-storage
vault was performed today. The following
items were checked: |
|
2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection | TM2 was connected in ITW with a Febiad
Test Target. |
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET | A Test Febiad Target was installed
and checked at SHC. |
|
2314
|
Wednesday, April 13, 2022, 11:54 |
Carla Babcock | South Hot-Cell | Maintenance | TM2 | | EZL cable change | Chad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays. |
|
2313
|
Monday, April 04, 2022, 21:04 |
Carla Babcock | Conditioning Station | Development | TM2 | | HV testing of IGLIS wires in TM2 | TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring. |
|
2312
|
Monday, April 04, 2022, 10:44 |
Nadia Jorgenson | South Hot-Cell | Repair | | | Turntable Chain Repair | Last week we repaired
the South Hot Cell turntable chain/sprocket. |
|
2311
|
Wednesday, March 02, 2022, 10:51 |
David Wang | ITE/ITW | Standard Operation | | | Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. | Replaced 9 old turbo pumps from ITE/ ITW
and one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage. |
|
2310
|
Tuesday, March 01, 2022, 11:51 |
David Wang | Spent Target Vault | Maintenance | | | UCx #32 has been repacked in NHC. | UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to take out
his samples( in two small plastic containers) |
|
2309
|
Friday, February 25, 2022, 10:22 |
Adam Newsome | South Hot-Cell | Development | | | Addition of E-Stops and Turntable Vertical Motion Limit Switch | Two changes have been made to the control
system to the South Hot Cell: