  2261   Friday, October 29, 2021, 12:27 Travis CaveSpent Target VaultStandard Operation Ta#56Repacking of the target. Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon
 Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf 
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer the five shielding blocks have been
moved from ITW to ITE. 
  
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached
 Target_Index_2021-10-13.pdf 
  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection the module with target UC#35 was
connected in ITE and being pumped down.
 IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg 
  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests the tests were done when TM4 was
on NHC. see attached photos please.
 IMG_3739.jpgIMG_3740.jpg 
  2256   Wednesday, October 06, 2021, 10:42 David WangITERepair  ITE IG1S cable end connector replacementITE IG1S cable end connector replacement
has been finished by Roy Huang. 
  
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE.
  
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection TM4 was disconnected and moved to
NHC. 
 IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg 
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test the test was done when TM2 sit on
NHC.
 IMG_3710.jpg 
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection TM2 been connected with new target
C#3 in ITW. 
 IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg 
  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target
  
  2250   Thursday, September 23, 2021, 19:04 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Remote CapabilityRemote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used
  
  2249   Wednesday, September 22, 2021, 11:13 Travis CaveSpent Target VaultStandard Operation UC#34Spent Target Move The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details.
 Target_Index_2021-09-22.pdf 
  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west
  
  2247   Friday, September 17, 2021, 14:28 Travis CaveSpent Target VaultStandard Operation Ta#62Spent Target Move The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See
 Target_Index_2021-09-17.pdf 
  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well.
 IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg 
  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections TM4 electric check with new target
was done by David. A pic attached here for
ref.
 IMG_3603.jpg 
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module moveTM#4 with SiC#41 has been moved from the
NHC to ITE.
  
  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module moveTM#4 with SiC#40 has been moved from the east
target station to the south hot cell.
  
  2242   Thursday, August 12, 2021, 14:13 Adam NewsomeITWRepair  West Entrance Module Move to ITWThe West Entrance Module has been moved
from the South Hot Cell to the West Target
Station.
  