ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2138
|
Wednesday, August 26, 2020, 09:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#60 | Ta#60 target electrical check and leak check at SHC. | Electrical check and leak check at SHC.
NO leak. electrical check ok.
Before target on, A is short to PQ, RU is |
|
2137
|
Tuesday, August 25, 2020, 09:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell. |
|
2136
|
Monday, August 24, 2020, 10:11 |
Adam Newsome | ITW | Standard Operation | | | Entrance Module to ITW | Entrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module, |
|
2135
|
Wednesday, August 19, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | | | ITW Entrance Module moved to SHC | ITW Entrance Module was moved from west
station to South Hot Cell. |
|
2134
|
Tuesday, August 18, 2020, 09:57 |
Adam Newsome | Conditioning Station | Standard Operation | TM2 | | TM2 Moved to Conditioning Station | TM2 was moved from ITW to the Conditioning
Station. |
|
2133
|
Tuesday, August 18, 2020, 09:06 |
David Wang | ITW | Standard Operation | TM2 | | TM2 and ITW entrance module have been disconnected in ITW | Tm2 and itw entrance module have been disconnected
in ITW. I will attach disconnection checklist
later. |
|
2132
|
Thursday, August 06, 2020, 14:33 |
Adam Newsome | Spent Target Vault | Development | | | Safety Group Relay Interface Installation | A relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote |
|
2131
|
Thursday, July 30, 2020, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
back to the west target station from the
conditioning station. |
|
2130
|
Wednesday, July 29, 2020, 09:20 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the south hot cell back to the
West Target Station. |
|
2129
|
Tuesday, July 28, 2020, 09:26 |
chad fisher | South Hot-Cell | Repair | | | Entrance Module Wire Scanner | Entrance module wire scanner has been replaced.
Pictures to follow. |
|
2128
|
Monday, July 27, 2020, 10:00 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the west target station to the
south hot cell for repairs. |
|
2127
|
Friday, July 24, 2020, 09:43 |
Travis Cave | Conditioning Station | Maintenance | TM2 | Graphite #1 | Module move | TM#2 has been moved from the west
station to the conditioning station. ITW
entrance module moved will take place on |
|
2126
|
Tuesday, July 21, 2020, 14:22 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2125
|
Thursday, July 16, 2020, 10:20 |
Adam Newsome | Safe Module Parking | Maintenance | | | SMP: Annual Electrical Inspection | An electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to |
|
2124
|
Monday, July 13, 2020, 10:01 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the conditioning
station to the silo.
|
|
2123
|
Tuesday, July 07, 2020, 17:43 |
Carla Babcock | ITE | Development | TM4 | | RF tests on new IG-LIS wiring | Tested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue). |
|
2122
|
Tuesday, July 07, 2020, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the silo
to the conditioning station, where David
and Frank will start on the gutting of the |
|
2121
|
Monday, July 06, 2020, 12:20 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Five shielding blocks to ITW | Five shielding blocks are transferred to
ITW |
|
2120
|
Monday, July 06, 2020, 07:54 |
David Wang | ITE | Standard Operation | TM4 | UCx 30 | TM4 has been connected in ITE connection | TM4 has been connected in ITE. Vacuum pumping
down is good so far. |
|
2119
|
Friday, July 03, 2020, 14:08 |
Travis Cave | ITE | Standard Operation | TM4 | UC#30 | Module move | TM#4 with UC#30 has been moved from
the south hot cell to the east target station. |
|