  RH-ISAC, Page 38 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject Text Attachments
  2008   Thursday, October 17, 2019, 11:49 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Loading F-308 The targets in the mini storage have
been loaded into the F-308.
  
  2007   Tuesday, October 15, 2019, 16:42 Isaac EarleSafe Module ParkingDevelopment  SMP flange alignment tested using shield plug As a preliminary test in preparation
for SMP commissioning, one of the steel module
shield plugs was installed into the SMP to
 smp1.jpgsmp2.jpgsmp3.jpgsmp4.jpg 
  2006   Thursday, October 10, 2019, 16:17 Adam NewsomeSafe Module ParkingDevelopment  SMP Main Panel: Relay Addition for E-Stop CircutAn update was made for the E-stop and power
supply system in the SMP main panel. Upon
testing remote control, it was determined
 Changes_to_IRH1869.JPGIMG_20191009_153336_-_new_relay_for_E-stop.jpg 
  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in
 Target_Index_2019-10-09.pdf 
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check Results of the electrical check of
TM4 without target and with UC27 and 28
 TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdfTM4_elec_chk__with_UC28_shc_Oct-04-2019.pdfTM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf 
  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist
 Ta_59_TM2_ITE__connection_checklist..pdf 
  2002   Monday, October 07, 2019, 09:56 Adam NewsomeITEStandard OperationTM2Ta 59TM2 MoveTM2 has been moved from the Conditioning
Station to ITE with Ta#59 target.
  
  2001   Friday, October 04, 2019, 16:50 David WangSouth Hot-CellStandard OperationTM4 UCx 28 target with TM4 SHC leak check and electrical check. TM4 HS Leak check result is good . No leak.
electrical check after target installation:
Bias to chassis 550 Mohm. Coils are shorted
  
  2000   Friday, October 04, 2019, 16:43 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS.TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. 
  
  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move TM#4 with UC#28 has been moved from
the south hot cell to the west target station.
  
  1998   Thursday, October 03, 2019, 10:25 Travis CaveSpent Target VaultStandard Operation ZrC#8Spent Target Move The spent ZrC#8 was moved from the
south hot cell to the spent target vault.
It was placed in pail 217 and the pail was
 Target_Index_2019-10-02.pdf 
  1997   Wednesday, October 02, 2019, 08:25 chad fisherSouth Hot-CellStandard Operation ZrC#8ZrC#8 PIEHeat shield has been removed from ZrC#8.  20191002_081653[1].jpg 
  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58Tuesday, October 01, 2019, 15:15: Started
roughing.
Tuesday, October 01, 2019, 16:30:
  
  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module.
 TM2_no_target_SHC_elec_chk_Oct-1-2019.pdfTM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf 
  1994   Tuesday, October 01, 2019, 10:22 chad fisherSouth Hot-CellStandard OperationTM2ZrC#8ZrC#8 Removed Ta#59 installedZrC#8 has been removed from TM2. Upon removal
of the high current tube heater bolts it
was noticed that the tube was broken. Also
 20190930_140918[1].jpg 
  1993   Tuesday, October 01, 2019, 09:23 Don JacksonITEMaintenanceTM2ZrC #860KV Common Connections1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way. 
This should of had no impact on the ZrC run
 TM2_Wiring.jpg 
  1992   Monday, September 30, 2019, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check Results of the electrical check on
TM#2 with ZrC#8 post beam.
 TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf 
  1991   Monday, September 30, 2019, 11:36 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Module move TM#2 with ZrC#8 has been moved from
the east station to the south hot cell.
  
  1990   Monday, September 30, 2019, 11:27 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum vessel modifications completedThe SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D.  In addition a tube stub was added
  
  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new
 Target_Index_2019-09-23_Mini_Vault.pdf 