ID Date Author Category Type Module Target/Number Subject Text Attachments
  208   Wednesday, November 07, 2012, 11:09 David WangSouth Hot-CellStandard OperationTM1TiC TM1 heat shield circuit leak check with TiC target at hot cellChad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The
  
  207   Wednesday, November 07, 2012, 10:25 Travis CaveConditioning StationStandard OperationTM1TiC#3module moveTM#1 with TiC#3 has been moved from the
south hot cell to the conditioning station,
move went well.
  
  206   Wednesday, November 07, 2012, 09:25 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details.
 TM_1_TiC_3_Elec_check_SHC.PDF 
  205   Tuesday, November 06, 2012, 14:00 chad fisherSouth Hot-CellStandard OperationTM1TiC#3TiC#3 InstalledTiC#3 sucessfully installed and ready for
leak and electrical check.
  
  204   Tuesday, November 06, 2012, 12:08 David WangITWStandard OperationTM1Nb#7TM1 disconnected in ITWBevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later.   
  
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 RemovalAttached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning.
 IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG 
  202   Tuesday, November 06, 2012, 11:06 Travis CaveITWStandard OperationTM1Nb#7module moveTM#1 with Nb#7 has been moved from the
west target station to the south hot cell
move went well.
  
  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assayThis week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details.
 Vault_Storage_November_2_2012.pdf 
  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were
  
  199   Wednesday, October 31, 2012, 11:24 David WangITEStandard OperationTM4 Transfer five shielding blocks from ITW to ITE.Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam.
  
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target moveThe NiO #1 spent target was placed into
storage today. It is in pail number 01 (101
on Vault Status page) and located in slot
 Vault_Storage_October_24_2012.pdf 
  197   Wednesday, October 24, 2012, 11:51 Travis CaveITEStandard OperationTM4UCx#5module movedYesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station,  move went well.
  
  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CSTM4 heat shield helium pressure test and
electrical check were done  at CS 
last week. The results are good. NO leak
  
  195   Tuesday, October 09, 2012, 14:53 Bevan MossConditioning StationDevelopmentTM4UCx#5Module MoveTM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage
  
  194   Tuesday, October 09, 2012, 13:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#5NiO#1 removal UCx#5 installationNiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and
 IMG_0780[1].JPG 
  193   Tuesday, October 09, 2012, 11:17 Bevan MossITEStandard OperationTM4NiO#1Module Move TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues.
  
  192   Tuesday, October 09, 2012, 10:35 David WangITEStandard OperationTM4NiO #1Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air.
  
  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hallGrant and I replaced the conditioning station
broken  srcoll pump with a refurbished
scroll pump which is supplied by vacuum group.
  
  190   Tuesday, October 02, 2012, 11:47 David WangITWStandard OperationTM1Nb#7I moved 5 shielding blocks from ITE to ITW.5 shielding blocks have been moved from
ITE to ITW. ITW is configured to take proton
beam now.
  
  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. 
  