1888
|
Friday, March 08, 2019, 14:10 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block polishing | After trials with 2000 grid wet paper I
have moved up to "red" scotch brite.
This seems to have worked the best so far |
|
1887
|
Thursday, March 07, 2019, 13:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | Polishing | Polishing of the water block sealing surfaces
has commenced. First attempt was on block
B with low nap brown polishing pad (the least |
|
1886
|
Thursday, March 07, 2019, 12:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Pre-polishing pictures | Pictures of the water blocks before polishing
can be found on docushare, collection 24400 |
|
1885
|
Thursday, March 07, 2019, 12:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | Box Off water block jig on | The containment box has been removed from
TM2 and the water block jig installed in
preparation for water block polishing. |
|
1884
|
Thursday, March 07, 2019, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 move from TCS to SHC. | TM2 has been moved from TCS to SHC. The
move is smooth. |
|
1883
|
Tuesday, March 05, 2019, 14:29 |
chad fisher | South Hot-Cell | Repair | | | Tray Transfer Fixture Repair Complete | Repair of the tray transfer fixture is
complete (minus testing).
A distorted ball nut lock plate was |
|
1882
|
Tuesday, March 05, 2019, 09:38 |
chad fisher | South Hot-Cell | Repair | | | Transfer Fixture Repair | Transfer fixture has been remotely disassembled
to the point where the ball nut lock plate
assembly can be inserted into the tool port |
|
1881
|
Tuesday, March 05, 2019, 07:20 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 HV test at TCS | Spark between HV cover vertical mesh plate
and HS 60KV bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed |
|
1880
|
Friday, March 01, 2019, 10:23 |
Travis Cave | Spent Target Vault | Standard Operation | | | Source tray moved | The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage |
|
1879
|
Friday, March 01, 2019, 09:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | TM4 optics tray was installed onto the
old TM2 source tray yesterday and tray filled
with non-active metal scrap. Tray inserted |
|
1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
|
1877
|
Tuesday, February 26, 2019, 10:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station. |
|
1876
|
Tuesday, February 26, 2019, 08:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box | The containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station. |
|
1875
|
Monday, February 25, 2019, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block jig | module side water block jig has been removed
in preparation for electrical checks. |
|
1874
|
Friday, February 22, 2019, 10:31 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | The source tray has been removed from TM2. |
6x |
1873
|
Thursday, February 21, 2019, 15:10 |
Isaac Earle | Safe Module Parking | Development | | | Seismic requirements for SMP | Dragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. |
|
1872
|
Wednesday, February 20, 2019, 09:07 |
chad fisher | South Hot-Cell | Repair | TM2 | | Module side waterblock jig | I have installed the module side water
block jig. |
|
1871
|
Tuesday, February 19, 2019, 11:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Optics tray removal | Aaron has removed the optics tray in TM2
in preparation for source tray removal. |
|
1870
|
Tuesday, February 19, 2019, 10:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment box removed | Containment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics |
|
1869
|
Friday, February 15, 2019, 12:09 |
David Wang | ITE | Maintenance | TM4 | | ITE water system maintenance. | The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes |
|