ID Date Author Category Type Module Target/Number Subject Text Attachments
  1888   Friday, March 08, 2019, 14:10 chad fisherSouth Hot-CellRepairTM2 Water block polishingAfter trials with 2000 grid wet paper I
have moved up to "red" scotch brite.
This seems to have worked the best so far
 B_after_SB_(2).jpg 
  1887   Thursday, March 07, 2019, 13:59 chad fisherSouth Hot-CellRepairTM2 PolishingPolishing of the water block sealing surfaces
has commenced. First attempt was on block
B with low nap brown polishing pad (the least
  
  1886   Thursday, March 07, 2019, 12:20 chad fisherSouth Hot-CellRepairTM2 Pre-polishing picturesPictures of the water blocks before polishing
can be found on docushare, collection 24400
  
  1885   Thursday, March 07, 2019, 12:02 chad fisherSouth Hot-CellRepairTM2 Box Off water block jig onThe containment box has been removed from
TM2 and the water block jig installed in
preparation for water block polishing.
 20190307_113548.jpg 
  1884   Thursday, March 07, 2019, 09:12 David WangConditioning StationStandard OperationTM2 TM2 move from TCS to SHC.TM2 has been moved from TCS to SHC. The
move is smooth. 
  
  1883   Tuesday, March 05, 2019, 14:29 chad fisherSouth Hot-CellRepair  Tray Transfer Fixture Repair CompleteRepair of the tray transfer fixture is
complete (minus testing).
A distorted ball nut lock plate was
 20190305_130312.jpg20190305_132303.jpg20190305_133800.jpg20190305_141346.jpg 
  1882   Tuesday, March 05, 2019, 09:38 chad fisherSouth Hot-CellRepair  Transfer Fixture RepairTransfer fixture has been remotely disassembled
to the point where the ball nut lock plate
assembly can be inserted into the tool port
 20190305_092228.jpg20190305_092231.jpg20190305_092326.jpg20190305_092558.jpg 
  1881   Tuesday, March 05, 2019, 07:20 David WangConditioning StationRepairTM2 TM2 HV test at TCSSpark between HV cover vertical mesh plate
and HS 60KV  bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed
  
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1879   Friday, March 01, 2019, 09:57 chad fisherSouth Hot-CellRepairTM2 TM2 Source tray removalTM4 optics tray was installed onto the
old TM2 source tray yesterday and tray filled
with non-active metal scrap. Tray inserted
 20190228_095131.jpg20190228_143718.jpg20190301_074849.jpg20190301_092907.jpg 
  1878   Friday, March 01, 2019, 08:42 Anders MjosConditioning StationStandard OperationTM2 Conditioning TM2 without source trayBIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
 TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx 
  1877   Tuesday, February 26, 2019, 10:33 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station.
  
  1876   Tuesday, February 26, 2019, 08:51 chad fisherSouth Hot-CellRepairTM2 TM2 containment boxThe containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station.
  
  1875   Monday, February 25, 2019, 09:44 chad fisherSouth Hot-CellRepairTM2 Water block jigmodule side water block jig has been removed
in preparation for electrical checks.
  
  1874   Friday, February 22, 2019, 10:31 chad fisherSouth Hot-CellRepairTM2 TM2 Source tray removalThe source tray has been removed from TM2.  6x 
  1873   Thursday, February 21, 2019, 15:10 Isaac EarleSafe Module ParkingDevelopment  Seismic requirements for SMPDragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. 
  
  1872   Wednesday, February 20, 2019, 09:07 chad fisherSouth Hot-CellRepairTM2 Module side waterblock jigI have installed the module side water
block jig.
  
  1871   Tuesday, February 19, 2019, 11:56 chad fisherSouth Hot-CellRepairTM2 Optics tray removalAaron has removed the optics tray in TM2
in preparation for source tray removal.
  
  1870   Tuesday, February 19, 2019, 10:20 chad fisherSouth Hot-CellRepairTM2 Containment box removedContainment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics
  
  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes
  