  1881   Tuesday, March 05, 2019, 07:20 David WangConditioning StationRepairTM2 TM2 HV test at TCSSpark between HV cover vertical mesh plate
and HS 60KV  bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed
  
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1879   Friday, March 01, 2019, 09:57 chad fisherSouth Hot-CellRepairTM2 TM2 Source tray removalTM4 optics tray was installed onto the
old TM2 source tray yesterday and tray filled
with non-active metal scrap. Tray inserted
 20190228_095131.jpg20190228_143718.jpg20190301_074849.jpg20190301_092907.jpg 
  1878   Friday, March 01, 2019, 08:42 Anders MjosConditioning StationStandard OperationTM2 Conditioning TM2 without source trayBIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
 TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx 
  1877   Tuesday, February 26, 2019, 10:33 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station.
  
  1876   Tuesday, February 26, 2019, 08:51 chad fisherSouth Hot-CellRepairTM2 TM2 containment boxThe containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station.
  
  1875   Monday, February 25, 2019, 09:44 chad fisherSouth Hot-CellRepairTM2 Water block jigmodule side water block jig has been removed
in preparation for electrical checks.
  
  1874   Friday, February 22, 2019, 10:31 chad fisherSouth Hot-CellRepairTM2 TM2 Source tray removalThe source tray has been removed from TM2.  6x 
  1873   Thursday, February 21, 2019, 15:10 Isaac EarleSafe Module ParkingDevelopment  Seismic requirements for SMPDragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. 
  
  1872   Wednesday, February 20, 2019, 09:07 chad fisherSouth Hot-CellRepairTM2 Module side waterblock jigI have installed the module side water
block jig.
  
  1871   Tuesday, February 19, 2019, 11:56 chad fisherSouth Hot-CellRepairTM2 Optics tray removalAaron has removed the optics tray in TM2
in preparation for source tray removal.
  
  1870   Tuesday, February 19, 2019, 10:20 chad fisherSouth Hot-CellRepairTM2 Containment box removedContainment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics
  
  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes
  
  1868   Friday, February 15, 2019, 12:05 David WangITEMaintenanceTM4 ITE annual vacuum leak check. Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response
  
  1867   Thursday, February 14, 2019, 14:02 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1866   Thursday, February 14, 2019, 07:13 David WangConditioning StationStandard OperationTM2 TCS vacuum pumps have been stopped.Preparation on TM2 move from TCS to SHC.   
  1865   Monday, February 11, 2019, 10:26 Isaac EarleSafe Module ParkingDevelopment  SMP shield box and vacuum vessel moved to Target Hall  On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical
 6x 
  1864   Thursday, January 31, 2019, 14:16 Isaac EarleNorth Hot-CellDevelopment  NHC grounding approval Franco Mammarella was consulted regarding
electrical grounding of the NHC design (RS103
of Document-131915).  After discussing
 NHC_grounding.pdf 
  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCSleak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are
  
  1862   Thursday, January 24, 2019, 10:34 David WangITWMaintenance  Changed 24VDC plugs of TP solenoid valves in ITW3 damaged 24VDC plugs of TP solenoid valves
are replaced. Inspected other plugs. All
of them are in good condition now. 
  