1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details. |
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached |
|
1706
|
Tuesday, May 01, 2018, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the East Target Station to the South Hot
cell. |
|
1705
|
Tuesday, May 01, 2018, 10:54 |
Keith C Ng | ITW | Repair | | | 2a2 window installation and beamtube repair | Yesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped, |
|
1704
|
Friday, April 27, 2018, 15:06 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair | Vacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees |
6x |
1703
|
Friday, April 20, 2018, 15:33 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair job | 2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed |
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
1701
|
Tuesday, April 17, 2018, 11:05 |
David Wang | ITW | Repair | | | Disconnect ITW entrance module | ITW entrance module has been disconnected.
All connections are labelled before or during
disconnection. The 24VDC electrical plug |
|
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move | Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell, |
|
1699
|
Tuesday, April 10, 2018, 10:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#2 has been moved from the south
hot cell to the south west silo. |
|
1698
|
Monday, April 09, 2018, 09:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell. |
|
1697
|
Monday, April 09, 2018, 06:36 |
David Wang | ITW | Standard Operation | | | ITW Turbo -pumps switch off | I asked MCR to switch off ITW TP3,4 TP1s,2s
this morning. |
|
1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement | ITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than
old pump on inlet and exhaust so a new solid |
|
1695
|
Friday, March 23, 2018, 09:34 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent Target Assay | All targets in the ISAC Spent Target
Vault have been either assayed and had field
measurement done on them or just measurement |
|
1694
|
Thursday, March 08, 2018, 14:10 |
David Wang | ITW | Maintenance | | | Two small water leak has been found in ITW. | Two small water leaks have been found on
ITW High active water system. One is from
an unused 1/4" copper valve stem. another |
|
1693
|
Wednesday, March 07, 2018, 10:36 |
David Wang | ITE/ITW Cooling | Development | | | HALCW resin can flow meter replacment | HALCW resin can flow meter replacement
is done. Less that 100 mL water was drained
to a small tray during the job. RPG checked |
|
1692
|
Wednesday, March 07, 2018, 10:18 |
David Wang | ITW | Standard Operation | | | Oil leak on target station vacuum primary back pump. | I can not see oil in sight window of the
primary pump during visual inspection. The
aluminum tray underneath the pump is filled |
|
1691
|
Tuesday, March 06, 2018, 09:53 |
David Wang | ITW | Standard Operation | TM2 | | Tm2 and Tm4 vacuum disconnection | The job is done. See attachment. |
|
1690
|
Monday, March 05, 2018, 13:47 |
Travis Cave | Spent Target Vault | Repair | | Many | Spent Target Assay | The spent target assay was aborted
today after the first target was finished
due to the very old computer that controls |
|
1689
|
Wednesday, February 28, 2018, 14:47 |
David Wang | ITE | Standard Operation | | | leak check ITE primary and secondary vacuum vessel. | 2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between. |
|