  ID Date Author Category Type Module Target/Number Subject Text Attachments
  1561   Monday, June 19, 2017, 07:29 David WangConditioning StationStandard OperationTM2 Update TH MS project schedule.Update TH MS project schedule. See attachment
1,2. 
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  1560   Thursday, June 15, 2017, 11:29 Isaac EarleNorth Hot-CellDevelopment  NHC inlet ducting installedThe North Hot Cell inlet ducting assembly
was installed today in the target hall at
the north end of the NHC roof block.  A
 IMG_0217.jpgIMG_0218.jpgIMG_0219.jpgIMG_0214.jpg 
  1559   Tuesday, June 13, 2017, 13:41 David WangITWStandard OperationTM2 TM2 has been connected in ITW.Yasmine and I connected TM2 in ITW today.
the control page is set to febiad mode. Both
gas line in ITW are opened for febiad run.
  
  1558   Tuesday, June 13, 2017, 11:10 Grant MinorCraneMaintenance  ISAC THall Crane 100% / 125% Load Test Documentation - 2011The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North
 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG 
  1557   Tuesday, June 13, 2017, 09:57 Travis CaveITWStandard OperationTM2SiC#36module movedTM#2 with SiC#36 has been moved from the
conditioning station to the west target station.
  
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target moveThe spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot
 Vault_Storage_June_12_2017.pdf 
  1555   Friday, June 09, 2017, 11:21 chad fisherNorth Hot-CellMaintenance  Model 'N' Slave Removal Through RoofIsaac and Chad disengaged the slave end
of the manipulator and performed a slave
removal through the slave removal roof hatch.
  
  1554   Thursday, June 08, 2017, 08:35 David WangConditioning StationDevelopmentTM2 TM2 gas line reconfiguration on the module top.Reconfigured TM2 gas line on the module
top. It matches with the febiad gas line
we are using on service tray now. Facing
 TM2_gas_line_on_the_top_002.JPG 
  1553   Thursday, June 08, 2017, 07:37 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 water llines at TCS. 
The helium pressure test on HS line is done
 TM2_helium_pressure_test..png 
  1552   Wednesday, June 07, 2017, 13:34 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.I started all turbo pumps.   
  1551   Wednesday, June 07, 2017, 13:33 David WangConditioning StationStandard OperationTM2 TM2 SiC#36 leakc check and electrical check.The results  are good. See attachment.  TM2_SiC_36#_leak_check_an_delectrical_check..pdf 
  1550   Tuesday, June 06, 2017, 13:42 chad fisherSouth Hot-CellStandard OperationTM2SiC#36Ta#51 removed SiC#36 installedThis afternoon Ta#51 was removed from TM2
and SiC#36 installed.
All new fasteners used. High current
  
  1549   Wednesday, May 24, 2017, 08:11 David WangITWStandard OperationTM2 TH schedule 132 update weeklySee attachments.  Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf 
  1548   Tuesday, May 23, 2017, 14:10 David WangITEStandard Operation  ITE water interlock check is done.We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The
  
  1547   Tuesday, May 23, 2017, 13:30 David WangITEStandard OperationTM4 TM4 has been connected in ITEYasmine and I connected TM4 in ITE . All
turbo pumps are started.
  
  1546   Tuesday, May 23, 2017, 10:41 Travis CaveITEStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the conditioning station to the east target
station.
  
  1545   Friday, May 19, 2017, 13:49 David WangConditioning StationRepairTM4 TM4 TP1 at TCSTM4 TP1 is replaced. TCS and TM4 was argon
vented before the job.The job took about
30minutes.  I started the all turbo
  
  1544   Friday, May 19, 2017, 12:25 David WangConditioning StationStandard OperationTM4 TCS and TM4 water flow measurement.  
 
  
  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical CheckElectrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details.
 TM4_UC20_Elec_chk_CS_vac.PDF 
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target moveThe spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put
 Vault_Storage_May_18_2017.pdf 