  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
south  hot hell to the conditioning
station. No problems with the move.
  
  154   Tuesday, July 31, 2012, 12:50 David WangSouth Hot-CellStandard OperationTM1UC xTM1 heat shield circuit leak check with UC x targetChad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped  down to the bottom leak rate
  
  153   Tuesday, July 31, 2012, 12:24 chad fisherSouth Hot-CellStandard OperationTM1UCx#4UCx#4 InstalledStarting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1.
  
  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module moveTM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move.
  
  151   Tuesday, July 31, 2012, 09:52 David WangITWStandard OperationTM1Ta38TM1 disconnected in ITWI disconnected TM1 in ITW.  Heat shield
line has been purged .
  
  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .  All water interlock checks for ITE
had been done. The ITE water signals  strength
and frequency(Espcially on MSP circuit) had
  
  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  147   Monday, July 16, 2012, 11:55 Bevan MossCraneRepair  Crane has stopped working

    

       
            
  
  146   Friday, July 13, 2012, 16:33 Bevan MossCraneRepair  Crane has stopped workingIn the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to
  
  145   Monday, July 09, 2012, 16:08 David WangITEStandard OperationTM4UO#3ITM4 in ITE connected and pumping down
 

 Normal
  0

 
   
  
  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module moveTM#4 with UO#3 from the conditioning station
to the east target station. Move went well.
  
  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.Connected leak detector to TM4 and CS vacuum
system. The vacuum readings  on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic
  
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target moveSiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the
 Vault_Storage_July_6_2012.pdf 
  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical checkElectrical check of the target was done
at the conditioning station under vacuum,
see attached file for details.
 TM#4_UO#3_elec_check_under_vac.PDF 
  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module moveTM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr.
  
  139   Wednesday, July 04, 2012, 13:18 David WangConditioning StationStandard OperationTM4uo#3leak check on heat shield circuit

    
        

           
  
  
  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical checkElectrical check of TM#4 with  UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that
 TM#4_UO#3_elec_check.PDF 
  137   Tuesday, July 03, 2012, 12:26 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27module moveTM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south
  
  136   Tuesday, July 03, 2012, 10:50 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside
  