1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
|
1380
|
Monday, October 24, 2016, 14:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#35 | SiC#35 installed | Sic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was |
|
|
1379
|
Monday, October 24, 2016, 12:22 |
chad fisher | South Hot-Cell | Repair | | | TM2 Insulator replacement | conductor insulators itd0053 and 54 have
been replaced on TM2. All fasteners (1/4-20
x 1 1/4 vented) torqued to 60 in lbs. |
|
|
1378
|
Monday, October 24, 2016, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south west
silo to the south hot cell. |
|
|
1377
|
Monday, October 24, 2016, 10:10 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair Complete | Maico entered the hot cell and re-strung
the skipped cable back onto the pulleys this
morning. Manipulator is now operational. |
|
|
1376
|
Friday, October 21, 2016, 15:10 |
Anders Mjos | South Hot-Cell | Repair | TM2 | Ta#49 | Stuck TGHT clamp bolt removal | During target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt |
|
|
1375
|
Friday, October 21, 2016, 12:51 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Broken cable has been replaced however
a cable has hopped some pulleys inside. After
two hours in cell the job was stopped with |
|
|
1374
|
Thursday, October 20, 2016, 14:17 |
Anders Mjos | ITE | Repair | TM4 | SiC#34 | HV enclosure inspection | The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems |
|
|
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move | Ta#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A. |
|
|
1372
|
Wednesday, October 19, 2016, 11:46 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo. |
|
|
1371
|
Wednesday, October 12, 2016, 10:01 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumps are stopped | Argon venting is started |
|
|
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
|
1369
|
Tuesday, October 11, 2016, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved from the
west target station to the south hot cell. |
|
|
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
|
1367
|
Friday, September 30, 2016, 14:34 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Weekly update TH schedule for beam schedule
131. See attachments 1,2 |
|
|
1366
|
Wednesday, September 28, 2016, 13:47 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumping down during mini-shut down. | A steel plate is covered on TCS.
TCS roughing pump is started now. The
TCS will be pumping down during mini-shut |
|
|
1365
|
Wednesday, September 28, 2016, 13:43 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected at ITE | All ITE turbo pumps have been started since
yesterday afternoon. The ITE and TM4 pumping
down is good so far. |
|
|
1364
|
Tuesday, September 27, 2016, 09:13 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#34 | module moved | TM#4 with SiC #34 has been moved to the
east target station. |
|
|
1363
|
Tuesday, September 27, 2016, 07:30 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been disconnected at TCS | TCS water system and vacuum system are
turned off this morning. The TCS and
TM4 are vented. |
|
|
1362
|
Monday, September 26, 2016, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#17 | Spent Target move | The spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details. |
|