  1138   Thursday, November 26, 2015, 06:25 David WangConditioning StationStandard OperationTM4UC#14TM4 vacuum has been connected in TCS.TM4 vacuum has been connected in TCS. All
vacuum pumps were started yesterday. The
pumping down of TM4 and TCS are good so far.
  
  1137   Wednesday, November 25, 2015, 15:37 Anders MjosConditioning StationStandard OperationTM4UC#14Conditioning Wednesday, November 25, 2015, 15:36:
RGA on

Thursday, November 26, 2015,
  
  1136   Wednesday, November 25, 2015, 14:16 chad fisherSouth Hot-CellRepair  Cell DeconCell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target.
 20151125_100512.jpg20151125_101620.jpg 
  1135   Wednesday, November 25, 2015, 14:13 chad fisherSouth Hot-CellStandard OperationTM4UC#14UCx#14UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs.
  
  1134   Wednesday, November 25, 2015, 11:55 Travis CaveConditioning StationStandard OperationTM4UC#14Module moved and electrical check.TM#4 with UC#14 was moved from the south
hot cell to the conditioning station. 
Here are the results of the electrical check
 TM4_UC14_elecchk_SHC.PDF 
  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module movedYesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell.
  
  1132   Tuesday, November 24, 2015, 14:03 chad fisherSouth Hot-CellStandard OperationTM4 Ta#46Ta#46 has been removed from TM4.   
  1131   Tuesday, November 24, 2015, 14:02 chad fisherSouth Hot-CellRepair  Left Manip repairelectronics package on left manip died
completely yesterday (it has been going for
a while).
  
  1130   Tuesday, November 24, 2015, 14:00 chad fisherSouth Hot-CellRepair  Compressible waste sorting.Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible
 20151124_101547.jpg 
  1129   Tuesday, November 24, 2015, 13:54 chad fisherSouth Hot-CellRepair  Cell DeconDecon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box
  
  1128   Monday, November 16, 2015, 13:59 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved back to the NW silo.   
  1127   Monday, November 16, 2015, 10:37 David WangConditioning StationRepairTM3 TM3 has been disconnected at TCS.I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this
  
  1126   Monday, November 16, 2015, 10:33 Anders MjosConditioning StationStandard Operation FEBIAD Test TargetHV conditioning by ISAC operatorsISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry
  
  1125   Monday, November 16, 2015, 10:09 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check after HV conditioning Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details.
 2015-11-16_TM3_Electrical_Test.pdf 
  1124   Monday, November 16, 2015, 08:04 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1123   Thursday, November 12, 2015, 13:25 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check and leak checkTarget to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached.  
 TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf 
  1122   Thursday, November 12, 2015, 10:18 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service cap

    

       
            
  
  1121   Tuesday, November 10, 2015, 16:53 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started
 2015-11-13_TCS_TM3_FEBIAD_Test_Target.docx 
  1120   Tuesday, November 10, 2015, 10:23 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service capConducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the  blue F/T insulator for
 TM3_Service_Cap_Leak.pdf 
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at
  