Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47
|
TM3 UCx#47 after operation electrical check is done at SHC. The result is normal. See attachment. |
Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection
|
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move
|
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault
details. |
Thursday, January 09, 2025, 11:46, David Wang, Safe Module Parking, Standard Operation, TM4, No target, SMP is under vacuum for TM4 storage during shut down.
|
SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down. |
Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings
|
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job. |
Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal
|
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues. |
Tuesday, January 07, 2025, 12:05, David Wang, ITE, Standard Operation, TM3, UCx #47, ITE primary and secondary vacuum vessel leak check for 2025 shut down
|
ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak. The TM3 waterlines helium pressure test will be
done at TCS when module is there. |
Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection
|
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving
|
Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025
winter shut down . |
Friday, January 03, 2025, 10:41, David Wang, ITW, Standard Operation, TM4, UCX46, ITW primary and secondary vacuum vessel leak check for 2025 shut down
|
ITW primary and secondary vacuum vessel leak check for 2025 shut down has been done. Also,TM4 internal water line helium pressure test has been
finished. Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate o-ring under 1Xe-8 atm.cc/sec which we
knoew in past years test. resin spray on leak area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak. See attachment |
Friday, January 03, 2025, 09:59, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Wednesday, December 18, 2024, 14:17, Adam Newsome, Pail Handling Tool, Maintenance, , , Pail Handling Tool - Inspection
|
An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection
was performed June 18, 2024 for this year.
The attachment to this e-log serves as a record of all inspections for this tool throughout 2024. |
Wednesday, December 18, 2024, 12:18, Adam Newsome, Spent Target Vault, Standard Operation, , , Five Pails Transferred from Main Vault to Mini Vault
|
Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails
staged for packaging into F-308s.
Nb#10, Pail 295, Tray 4A |
Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer
|
5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving. |
Thursday, December 05, 2024, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#68, Spent target move - Ta#68 in Pail 300
|
Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index
spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it
is planned to remove five pails in January 2025. |
Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300
|
December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane
Hot Cell Prep:
Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening
Loading: |
Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x
|
Abstract:
This target has seen some irregular beam patterns
Possibility that the beam hit the walls of the target tube or even the cooling fins |
Wednesday, December 04, 2024, 10:40, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - SHC to silo
|
TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth. |
Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged.
|
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection
|
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. |
|