Friday, June 06, 2025, 08:36, David Wang, Crane, Maintenance, , , TH crane main hoist B starting delay issue appears again.
Friday, May 23, 2025, 13:12, chad fisher, Manipulator Maintenance, Repair, , , SHC West manipulator tong cable replacement
Friday, May 16, 2025, 10:36, Frank Song, ITW, Standard Operation, TM2, UC#49 , Module Connection
Wednesday, May 14, 2025, 09:45, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UC#48 IGLIS, shielding blocks transfer
Tuesday, May 13, 2025, 13:13, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
Tuesday, May 13, 2025, 13:12, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
Monday, May 12, 2025, 09:17, David Wang, Facilities, Standard Operation, , , BL2A MAA ASU Test
Wednesday, May 07, 2025, 13:41, Aaron Tam, North Hot-Cell, Standard Operation, TM2, UC#49 , UC#49 SIS w/ Gasline Install
Tuesday, May 06, 2025, 14:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UC#49, electrical check/leak check
Tuesday, May 06, 2025, 09:18, Frank Song, ITE, Standard Operation, TM4, UCx#48, Module Connection
Monday, May 05, 2025, 09:18, chad fisher, North Hot-Cell, Maintenance, , , Manipulator Remote End Replacement 9352 with 9764
Friday, May 02, 2025, 10:16, Aaron Tam, North Hot-Cell, Maintenance, , , NHC Window Oil Fill
12x
Thursday, May 01, 2025, 09:33, Travis Cave, ITE, Standard Operation, TM4, UC#48, Module move
Friday, April 25, 2025, 14:30, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
Thursday, April 24, 2025, 13:42, David Wang, Conditioning Station, Standard Operation, , , Refilled TCS:TK2 from 11" to 28.8 "
Thursday, April 24, 2025, 12:53, Aaron Tam, North Hot-Cell, Standard Operation, TM4, UC#48, UC#48 IGLIS Install onto TM4
Thursday, April 24, 2025, 11:33, Travis Cave, Conditioning Station, Standard Operation, , UC#48, Module move
Thursday, April 24, 2025, 11:13, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#48, electrical check/leak check
Wednesday, April 23, 2025, 14:08, Adam Newsome, North Hot-Cell, Standard Operation, TM4, , TM4 Module Move
Friday, April 11, 2025, 13:46, chad fisher, North Hot-Cell, Repair, , , Remote end 9**4 repair