  RH-Cyclotron, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Typeup Subject Text Attachments
  120   Saturday, April 04, 2020, 09:47 Dan McDonaldCyclotronStandard OperationLid down operationsLid down operations for 2019/2020 shutdown
went ahead as planned on March 10th 2020
with Dan Louie and Arthur Leung absent due
 lid_down_2020.xlsx 
  127   Friday, January 22, 2021, 14:30 Adam NewsomeCyclotronStandard OperationLid up operation - 2021The lid
up operation took place on Jan. 22, 2021.
The
  
  131   Thursday, April 01, 2021, 13:47 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue. 
  
  136   Wednesday, January 19, 2022, 09:50 Travis CaveShieldingStandard OperationShield door is now open The shield door is now open on the
RH B2 level.
  
  137   Friday, February 04, 2022, 11:52 Adam NewsomeCyclotronStandard OperationLid up operation - 2022The lid up operation
took place on Feb. 4, 2022. 
  
  140   Wednesday, April 27, 2022, 16:05 Adam NewsomeCyclotronStandard OperationLid down operation - 2022The lid down operation
took place on Apr. 27, 2022. 
  
  144   Tuesday, May 10, 2022, 11:31 Nadia JorgensonCyclotronStandard OperationVault Shield Door Closed The vault shield door
has been closed and seal inflated. The operation
  
  148   Monday, January 30, 2023, 12:20 Adam NewsomeCyclotronStandard OperationLid up operation - 2023 The lid up operation
took place on Jan. 30, 2023. 
 2023_Synchro_Counts.xlsx2023_Jacks_Infrared_Data.xlsx 
  152   Friday, March 31, 2023, 13:22 Adam NewsomeCyclotronStandard OperationLid down operation - 2023The lid down operation
took place on Mar. 31, 2023. 
 Elevation_System_Checklist_-_March_31_2023.pdf 
  153   Wednesday, April 26, 2023, 11:19 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue.
  
  167   Friday, February 09, 2024, 15:43 Adam NewsomeElevation JackStandard OperationLid up operation - 2024The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4.
 Elevation_System_Checklist_-_February_2024.xlsxElevation_System_Thermal_Imaging_Report_-_Lid_Up_Feb_2024.pdf 
  170   Friday, April 19, 2024, 15:18 Adam NewsomeCyclotronStandard OperationLid down operation - 2024The lid down operation
took place on April 19, 2024. 
 Elevation_System_Checklist_-_2024.xlsx 
  171   Wednesday, April 24, 2024, 14:26 Adam NewsomeElevation JackStandard OperationLid up operation (second) - 2024Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown.
 Elevation_System_Checklist_-_2024_-_Second_Lid_Up.pdf 
  172   Tuesday, April 30, 2024, 15:00 Adam NewsomeCyclotronStandard OperationLid down operation (second) - 2024 A second lid down
operation took place on April 30, 2024. 
 Elevation_System_Checklist_-_2024_-_Second_Lid_Down.pdf 
  173   Thursday, May 02, 2024, 12:42 Adam NewsomeElevation JackStandard OperationLid up operation (third) - 2024The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and  finishing at ~12:12pm
under work permit C2024-05-02-5. 
 Elevation_System_Checklist_-_2024_-_May.pdf 
  174   Tuesday, May 07, 2024, 09:35 Adam NewsomeElevation JackStandard Operation Lid down operation (third) - 2024 A third lid down
operation took place over May 6-7, 2024.
 Motor_Contactor_6_-_2024.PNGElevation_System_Checklist_-_2024_Lid_down_-_third.pdf 