111
|
Tuesday, April 03, 2018, 11:57 |
Travis Cave | Cyclotron | Standard Operation | Blue Shield Door Shut. | The Blue Shield Door on the B2 level
of the RH building has been closed. |
|
136
|
Wednesday, January 19, 2022, 09:50 |
Travis Cave | Shielding | Standard Operation | Shield door is now open | The shield door is now open on the
RH B2 level. |
|
60
|
Monday, March 09, 2015, 11:55 |
chad fisher | Elevation Jack | Maintenance | Checking for contamination on fall arrest equip. | Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped. |
|
61
|
Tuesday, March 10, 2015, 10:24 |
chad fisher | Elevation Jack | Maintenance | Contaminated equipment update | The harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has |
|
5
|
Tuesday, September 25, 2012, 08:57 |
maicodallavalle | Elevation Jack | Maintenance | 2012 Service Maintance of #4 Station Jacking System | Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked |
|
6
|
Thursday, October 25, 2012, 13:58 |
maicodallavalle | Service Bridge | Maintenance | Orbit Drive | It was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive |
|
13
|
Wednesday, February 13, 2013, 08:55 |
maicodallavalle | Service Bridge | Repair | Service Bridge/Carrier Hydraulic Jacks | On Monday February 4TH the Service
Bridge was being lifted into the Cyclotron
with the Carrier. It was noticed that one |
|
25
|
Thursday, January 16, 2014, 08:46 |
maicodallavalle | Trolleys serviced | Maintenance | Pre Cyclotron work servicing and checking | This is a list of all the trolleys and
other equipment witch were checked and serviced
prior to work in the Cyclotron. |
|
47
|
Friday, January 23, 2015, 10:27 |
maicodallavalle | Elevation Jack | Maintenance | 2015 Jack Maintenance - Stations #4 and Station #9 | The Cyclotron Elevating System Shut Down
work done this year was done on Station #4
and Station #9. |
|
48
|
Monday, January 26, 2015, 07:57 |
maicodallavalle | Elevation Jack | Maintenance | Fall arrest Platform Railing | All of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up. |
|
62
|
Tuesday, March 17, 2015, 13:04 |
maicodallavalle | Cyclotron | Maintenance | Upper Bearings Station #5 and #10 | The Upper bearings on Station #5 and Station
#10 have been serviced. The Upper Bearing
were disassembled. The old gear was removed |
|
63
|
Thursday, March 19, 2015, 13:14 |
maicodallavalle | Shielding | Standard Operation | Remote Handling B2 level Shielding door | The Remote Handling B2 level Shielding
door has been closed. |
|
73
|
Tuesday, October 27, 2015, 07:50 |
maicodallavalle | Elevation Jack | Standard Operation | Service to Station # 9 Right side | Station #9 Cleaning of discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side |
9x |
76
|
Wednesday, January 27, 2016, 10:51 |
maicodallavalle | Elevation Jack | Maintenance | 2016 Cyclotron Elevation System Maintenance | The Cyclotron Elevating System Shut Down
work done this year was done on Station #9
and Station #10. |
|
109
|
Monday, February 19, 2018, 12:58 |
maicodallavalle | Trolley | Repair | Lift Trolley Repair | We had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the |
|
149
|
Thursday, February 02, 2023, 07:05 |
maicodallavalle | Service Bridge | Repair | Hinged Festoon Rail at Cyclotron | The Hinged section of the festoon rail
at Cyclotron has a piston to keep rail in
the up position for shutdown work (Bridge |
|