Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron, Page 1 of 9  Not logged in ELOG logo
ID Date Authordown Category Type Subject Text Attachments
  5   Tuesday, September 25, 2012, 08:57 maicodallavalleElevation JackMaintenance2012 Service Maintance of #4 Station Jacking System Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked
  
  6   Thursday, October 25, 2012, 13:58 maicodallavalleService BridgeMaintenanceOrbit DriveIt was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive
  
  13   Wednesday, February 13, 2013, 08:55 maicodallavalleService BridgeRepairService Bridge/Carrier Hydraulic JacksOn Monday February 4TH  the Service
Bridge was being lifted into  the Cyclotron
with the Carrier. It was noticed that one
 Hydraulic_Jack_RC-254.pdf 
  25   Thursday, January 16, 2014, 08:46 maicodallavalleTrolleys servicedMaintenancePre Cyclotron work servicing and checkingThis is a list of all the trolleys and
other equipment witch were checked and serviced
prior to work in the Cyclotron.
  
  47   Friday, January 23, 2015, 10:27 maicodallavalleElevation JackMaintenance2015 Jack Maintenance - Stations #4 and Station #9The Cyclotron Elevating System Shut Down 
work done this year was done on Station #4
and Station #9.
  
  48   Monday, January 26, 2015, 07:57 maicodallavalleElevation JackMaintenanceFall arrest Platform RailingAll of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up.
  
  62   Tuesday, March 17, 2015, 13:04 maicodallavalleCyclotronMaintenanceUpper Bearings Station #5 and #10The Upper bearings on Station #5 and Station
#10 have been serviced. The Upper Bearing
were disassembled. The old gear was removed
  
  63   Thursday, March 19, 2015, 13:14 maicodallavalleShieldingStandard OperationRemote Handling B2 level Shielding doorThe Remote Handling B2 level Shielding
door has been closed.
  
  73   Tuesday, October 27, 2015, 07:50 maicodallavalleElevation JackStandard OperationService to Station # 9 Right side Station #9 Cleaning of  discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side
 9x 
  76   Wednesday, January 27, 2016, 10:51 maicodallavalleElevation JackMaintenance2016 Cyclotron Elevation System Maintenance The Cyclotron Elevating System Shut Down 
work done this year was done on Station #9
and Station #10.
  
  109   Monday, February 19, 2018, 12:58 maicodallavalleTrolleyRepairLift Trolley RepairWe had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the
  
  149   Thursday, February 02, 2023, 07:05 maicodallavalleService BridgeRepair Hinged Festoon Rail at Cyclotron The Hinged section of the festoon rail
at Cyclotron has a piston to keep rail in
the up position for shutdown work (Bridge
  
  60   Monday, March 09, 2015, 11:55 chad fisherElevation JackMaintenanceChecking for contamination on fall arrest equip.Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped.
  
  61   Tuesday, March 10, 2015, 10:24 chad fisherElevation JackMaintenanceContaminated equipment updateThe harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has
  
  14   Wednesday, February 27, 2013, 12:08 Travis CaveCyclotronStandard OperationInstallation of 2C2C has been installed located on all QDLs
and all the numbers, continuity check done
and passed. Bridge has been removed from
  
  15   Tuesday, March 05, 2013, 14:11 Travis CaveCyclotronStandard OperationSetup and the Installation of the HE 1 probe.Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem
  
  24   Monday, September 30, 2013, 14:02 Travis CaveService BridgeMaintenancenew festooningThe festooning and bearings for the festooning
cars for both outriggers has been replaced
and it is in working order.
  
  26   Friday, January 17, 2014, 07:53 Travis CaveTrolleys servicedStandard OperationTrolley checksAll trolleys work electrically and control
wise. One encoder was found non functioning
on the upper resonator trolley for the vertical
  
  29   Friday, January 24, 2014, 14:10 Travis CaveCyclotronStandard OperationCopper blockersThe copper blockers have been removed from
the cyclotron and placed into the coffins.
  
  30   Monday, January 27, 2014, 14:42 Travis CaveShieldingStandard Operationshields and radiation survey The cyclotron radiation survey was aborted
due to the orbit not working recording the
numbers correctly. One shield has been in
 Meeting_Orbital_Counter_Problem_Jan_2014.pdf 