  30   Monday, January 27, 2014, 14:42 Travis CaveShieldingStandard Operationshields and radiation survey The cyclotron radiation survey was aborted
due to the orbit not working recording the
numbers correctly. One shield has been in
 Meeting_Orbital_Counter_Problem_Jan_2014.pdf 
  31   Tuesday, January 28, 2014, 14:59 Travis CaveShieldingStandard Operationshields 200's, 400's, 500's, 600's, and a pallet
of 700's have been installed
  
  33   Thursday, January 30, 2014, 13:47 Travis CaveCyclotronStandard OperationshieldsAll shields, pothole covers, and ladders
have been installed into the cyclotron.
  
  38   Tuesday, February 25, 2014, 15:00 Travis CaveShieldingStandard OperationshieldsStarted on the removal of shields.   
  39   Wednesday, February 26, 2014, 14:55 Travis CaveShieldingStandard OperationshieldsMore shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise
  
  40   Monday, March 03, 2014, 13:09 Travis CaveCyclotronStandard Operationshieldsall shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about
  
  78   Friday, February 05, 2016, 14:55 Travis CaveShieldingStandard Operationshadow shieldsall 200, 400, 500, 600, and some 700 series
of shield are in.
  
  80   Tuesday, February 09, 2016, 14:48 Travis CaveCyclotronStandard Operationshadow shieldsAll shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow.
  
  81   Wednesday, February 10, 2016, 14:53 Travis CaveCyclotronStandard Operationshadow shieldsAll cyclotron in tank work is completed.   
  79   Friday, February 05, 2016, 14:57 Travis CaveService BridgeMaintenanceoutrigger problemoutrigger 1 had a power failure, bridge
was removed power restored and outrigger
parked, outrigger will be looked at once
  
  24   Monday, September 30, 2013, 14:02 Travis CaveService BridgeMaintenancenew festooningThe festooning and bearings for the festooning
cars for both outriggers has been replaced
and it is in working order.
  
  139   Monday, March 21, 2022, 13:14 Adam NewsomeTrolleyRepairVideo Trolley Mk 1 - Radial Limit Switch ReplacementAn issue was observed in which radial motion
on the Video Trolley Mk 1 did not respond
to commands. After troubleshooting, it was
  
  4   Friday, February 17, 2012, 15:07 Don JacksonTrolleyRepairVideo Trolley Failed in Cyclotron TankAll control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and
 Stuck_Video_Trolley_Feb_17_2012_005.jpgStuck_Video_Trolley_Feb_17_2012_001.jpg 
  147   Friday, January 27, 2023, 12:12 Adam NewsomeInfrastructureDevelopmentVault crane - inspection, remote pendant installationThe vault crane annual inspection was completed
by Tom Kauss. 
 
  
  131   Thursday, April 01, 2021, 13:47 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue. 
  
  144   Tuesday, May 10, 2022, 11:31 Nadia JorgensonCyclotronStandard OperationVault Shield Door Closed The vault shield door
has been closed and seal inflated. The operation
  
  153   Wednesday, April 26, 2023, 11:19 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue.
  
  119   Wednesday, February 05, 2020, 15:04 Adam NewsomeTrolleyRepairUpper resonator trolley: cylinders for Ex 2C tasks[B]Cylinder 4[/B] on the upper resonator trolley
was not fully functional when removing Ex
2C during 2020 shutdown. It worked occasionally.
  
  135   Tuesday, August 31, 2021, 14:28 Adam NewsomeTrolleys servicedDevelopmentUpper Resonator Trolley - Finger Cylinders ReplacedThe two support fingers on the upper resonator
trolley were bent due to excessive loading
during cylinder toggling.
 new_fingers.PNG 
  62   Tuesday, March 17, 2015, 13:04 maicodallavalleCyclotronMaintenanceUpper Bearings Station #5 and #10The Upper bearings on Station #5 and Station
#10 have been serviced. The Upper Bearing
were disassembled. The old gear was removed
  