Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron, Page 7 of 10  Not logged in ELOG logo
ID Date Author Category Type Subjectdown Text Attachments
  184   Monday, June 24, 2024, 12:53 Riley SykesElevation JackMaintenanceHighfield Service Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected
  
  94   Tuesday, February 21, 2017, 13:40 Isaac EarleCyclotronStandard OperationHE2 Probe Returned to Cyclotron The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165.  An orbital
  
  93   Thursday, February 09, 2017, 15:21 Isaac EarleCyclotronStandard OperationHE2 Probe Removed The HE2 probe was
removed from the cyclotron today following
  
  106   Thursday, January 25, 2018, 17:16 Isaac EarleCyclotronStandard OperationHE1 probe removed The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165.  The reason for removal is so
  
  107   Wednesday, January 31, 2018, 11:20 Isaac EarleCyclotronStandard OperationHE1 probe reinstalled HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165.  Hardware for the
  
  82   Tuesday, February 16, 2016, 16:32 Isaac EarleCyclotronStandard OperationHE1 Probe Removed from CyclotronThe HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released
  
  83   Friday, February 19, 2016, 10:17 Isaac EarleCyclotronStandard OperationHE1 Probe Installed in Cyclotron The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and
  
  8   Wednesday, January 30, 2013, 14:44 Grant MinorElevation JackStandard OperationFurther lid-up notes from Dan LouieDan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant
 Dan_Louie_Lid-Up_e-mail_30Jan2013.pdf 
  129   Friday, February 26, 2021, 08:29 Adam NewsomeTrolleys servicedMaintenanceFirst Turn Radial Flag (FTRF) Jig - Pneumatic UpgradeOld fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing.
 PXL_20210216_202019350.jpg 
  160   Tuesday, November 14, 2023, 12:13 Nadia JorgensonService BridgeRepairFirst Festooning Car "H" channel replacement  Damaged "H" channel removed
from the first festooning car, and spare
channel was put in place.
 Festooning_car_H_channel_deformation.pngFestooning_car_H_channel_bottom_face.png 
  142   Tuesday, May 10, 2022, 11:26 Nadia JorgensonCyclotronRepairFestooning rail rope and pulley system re-routedThe rope and pulley system that is used
to raise the festooning rail across the vault
shield door has been re-routed. It now makes
  
  48   Monday, January 26, 2015, 07:57 maicodallavalleElevation JackMaintenanceFall arrest Platform RailingAll of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up.
  
  84   Thursday, February 25, 2016, 11:41 Travis CaveCyclotronStandard OperationEx 2C removalEx 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot.
  
  85   Tuesday, March 01, 2016, 13:27 Travis CaveCyclotronStandard OperationEx 2C installEX 2C has been installed back into the
cyclotron.
  
  132   Tuesday, April 20, 2021, 15:02 Adam NewsomeCarrierDevelopmentEmergency Trolley Rescue Winch: Installed and TestedAn emergency trolley rescue winch (TRH1527)
was developed for the purposes of retrieving
trolleys from the cyclotron tank whose radial
 PXL_20210420_185918486.MP.jpgPXL_20210420_190619179.jpg 
  122   Sunday, April 05, 2020, 13:24 Dan McDonaldElevation JackMaintenanceElevating system station swap 2019-2020Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we
  
  166   Thursday, February 08, 2024, 08:50 Adam NewsomeElevation JackMaintenanceElevating system - station 10 motor contactor issueIt was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor
  
  165   Wednesday, February 07, 2024, 12:04 Adam NewsomeElevation JackRepairElevating system - brake master relay fuse issueIt was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly.
  
  150   Friday, February 03, 2023, 08:27 Eric LaheElevation JackMaintenanceElevating System Jack Inspection  Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023).
 Elevation_System_Checklist_-_Jan312023.xlsx 
  164   Wednesday, January 31, 2024, 15:06 Eric LaheElevation JackMaintenanceElevating System - Annual Station Swap 2023-2024 The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322, 
Work done after electrical lockout
  
ELOG V2.9.2-2455