48
|
Monday, January 26, 2015, 07:57 |
maicodallavalle | Elevation Jack | Maintenance | Fall arrest Platform Railing | All of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up. |
|
49
|
Tuesday, January 27, 2015, 11:39 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Up Report 26 Jan 2015 |
Normal
0
|
|
59
|
Friday, March 06, 2015, 16:42 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Down Report 6-March-2015 | Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422 |
|
60
|
Monday, March 09, 2015, 11:55 |
chad fisher | Elevation Jack | Maintenance | Checking for contamination on fall arrest equip. | Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped. |
|
61
|
Tuesday, March 10, 2015, 10:24 |
chad fisher | Elevation Jack | Maintenance | Contaminated equipment update | The harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has |
|
64
|
Thursday, March 26, 2015, 15:48 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up 26 March 2015 | Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid |
|
68
|
Thursday, April 16, 2015, 15:26 |
Grant Minor | Elevation Jack | Maintenance | Cyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015 | |
|
70
|
Thursday, September 17, 2015, 18:38 |
Grant Minor | Elevation Jack | Maintenance | Station 9 Jack Worm Gear Inspection - unusual wear markings 16Sept2015 | Unusual wear markings were observed on
the Station 9 jack (not sure if L or R jack?)
during a visual inspection. |
8x |
71
|
Wednesday, September 30, 2015, 11:26 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Right Side - Unusual Wear Investigation | The following people were consulted
regarding the unusal wear noticed on jack
station #9 right side |
7x |
72
|
Wednesday, September 30, 2015, 11:52 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Left Side - Inspection & Service Status | The left side jack was disassembled and
cleaned. It was discovered that the
left side had been rebuilt with a new jack |
15x |
73
|
Tuesday, October 27, 2015, 07:50 |
maicodallavalle | Elevation Jack | Standard Operation | Service to Station # 9 Right side | Station #9 Cleaning of discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side |
9x |
75
|
Tuesday, January 19, 2016, 17:59 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12 | The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico. |
22x |
76
|
Wednesday, January 27, 2016, 10:51 |
maicodallavalle | Elevation Jack | Maintenance | 2016 Cyclotron Elevation System Maintenance | The Cyclotron Elevating System Shut Down
work done this year was done on Station #9
and Station #10. |
|
90
|
Wednesday, September 14, 2016, 11:30 |
Dan McDonald | Elevation Jack | Maintenance | Jack station 10B | Annual jack maintenance : Jack 10b upon
inspection it was found that the output shaft
seal on 10b was in need of replacement. In |
14x |
92
|
Monday, February 06, 2017, 20:32 |
Jason Kapalka | Elevation Jack | Maintenance | 2017 Cyclotron Elevating System Maintenance | The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
|
|
110
|
Friday, February 23, 2018, 15:44 |
Jason Kapalka | Elevation Jack | Repair | Replacement of Elevating System wiring | On January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
|
|
112
|
Tuesday, January 22, 2019, 07:18 |
Dan McDonald | Elevation Jack | Maintenance | Station 11-12 jack swap and hoist plate instal | Prior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions |
|
122
|
Sunday, April 05, 2020, 13:24 |
Dan McDonald | Elevation Jack | Maintenance | Elevating system station swap 2019-2020 | Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we |
|
146
|
Thursday, October 06, 2022, 17:15 |
Adam Newsome | Elevation Jack | Maintenance | Preventative Maintenance: MCC-E elevating system motor contactors | Under work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs |
|
150
|
Friday, February 03, 2023, 08:27 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System Jack Inspection | Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023). |
|