  ID Date Authordown Category Type Subject Text Attachments
  80   Tuesday, February 09, 2016, 14:48 Travis CaveCyclotronStandard Operationshadow shieldsAll shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow.
  
  81   Wednesday, February 10, 2016, 14:53 Travis CaveCyclotronStandard Operationshadow shieldsAll cyclotron in tank work is completed.   
  84   Thursday, February 25, 2016, 11:41 Travis CaveCyclotronStandard OperationEx 2C removalEx 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot.
  
  85   Tuesday, March 01, 2016, 13:27 Travis CaveCyclotronStandard OperationEx 2C installEX 2C has been installed back into the
cyclotron.
  
  88   Thursday, April 07, 2016, 11:04 Travis CaveCyclotronStandard OperationClosed the shield doorThe shield door on the B2 level of the
RH building has been closed.
  
  91   Tuesday, January 31, 2017, 14:41 Travis CaveCyclotronStandard OperationShield installation200, 400, 500, 600, and a pallet of 700
series of shield have been installed in the
cyclotron.
  
  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work All cyclotron in tank work has been
completed.
  
  111   Tuesday, April 03, 2018, 11:57 Travis CaveCyclotronStandard OperationBlue Shield Door Shut. The Blue Shield Door on the B2 level
of the RH building has been closed.
  
  136   Wednesday, January 19, 2022, 09:50 Travis CaveShieldingStandard OperationShield door is now open The shield door is now open on the
RH B2 level.
  
  86   Wednesday, March 09, 2016, 17:09 Ron KuramotoCyclotronDevelopmentEX4N new housing installationThe new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3
 dspage07994143927104268192.pdfExtr_4N_Final_instalation_-_gimbal-pipe-valve.docxIMG_1886.JPG 
  175   Tuesday, May 14, 2024, 10:53 Riley SykesCarrierMaintenanceCarrier underrail wheels maintenance All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set.
  
  176   Thursday, May 16, 2024, 12:33 Riley SykesService BridgeMaintenanceCenter Post Bearing Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES
  
  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder
  
  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit
  
  179   Friday, May 31, 2024, 12:47 Riley SykesTrolleys servicedMaintenanceTool Trolley Scheduled Maintenance 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES,
 Tool_Trolley_Drive_Motor.jpg 
  180   Monday, June 03, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceUpper Resonator Trolley 24 Month, 60 month
service completed. Bearings for drive motor
  
  181   Tuesday, June 04, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceLower Resonator Trolley  12, 24 and 60   
  182   Wednesday, June 12, 2024, 10:35 Riley SykesTrolleys servicedMaintenanceOutriggers 1 and 2 Service 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000
  
  183   Friday, June 14, 2024, 10:04 Riley SykesService BridgeMaintenanceService/ Bridge inspection Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub
  
  184   Monday, June 24, 2024, 12:53 Riley SykesElevation JackMaintenanceHighfield Service Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected
  