80
|
Tuesday, February 09, 2016, 14:48 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow. |
|
81
|
Wednesday, February 10, 2016, 14:53 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All cyclotron in tank work is completed. |
|
84
|
Thursday, February 25, 2016, 11:41 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C removal | Ex 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot. |
|
85
|
Tuesday, March 01, 2016, 13:27 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C install | EX 2C has been installed back into the
cyclotron. |
|
88
|
Thursday, April 07, 2016, 11:04 |
Travis Cave | Cyclotron | Standard Operation | Closed the shield door | The shield door on the B2 level of the
RH building has been closed. |
|
91
|
Tuesday, January 31, 2017, 14:41 |
Travis Cave | Cyclotron | Standard Operation | Shield installation | 200, 400, 500, 600, and a pallet of 700
series of shield have been installed in the
cyclotron. |
|
105
|
Tuesday, January 16, 2018, 13:43 |
Travis Cave | Cyclotron | Standard Operation | Cyclotron in tank work | All cyclotron in tank work has been
completed. |
|
111
|
Tuesday, April 03, 2018, 11:57 |
Travis Cave | Cyclotron | Standard Operation | Blue Shield Door Shut. | The Blue Shield Door on the B2 level
of the RH building has been closed. |
|
136
|
Wednesday, January 19, 2022, 09:50 |
Travis Cave | Shielding | Standard Operation | Shield door is now open | The shield door is now open on the
RH B2 level. |
|
86
|
Wednesday, March 09, 2016, 17:09 |
Ron Kuramoto | Cyclotron | Development | EX4N new housing installation | The new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3 |
|
175
|
Tuesday, May 14, 2024, 10:53 |
Riley Sykes | Carrier | Maintenance | Carrier underrail wheels maintenance | All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set. |
|
176
|
Thursday, May 16, 2024, 12:33 |
Riley Sykes | Service Bridge | Maintenance | Center Post Bearing | Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES |
|
177
|
Friday, May 31, 2024, 08:57 |
Riley Sykes | Carrier | Maintenance | Carrier Drive motor/gear reducer | Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder |
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|
179
|
Friday, May 31, 2024, 12:47 |
Riley Sykes | Trolleys serviced | Maintenance | Tool Trolley Scheduled Maintenance | 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES, |
|
180
|
Monday, June 03, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Upper Resonator Trolley | 24 Month, 60 month
service completed. Bearings for drive motor |
|
181
|
Tuesday, June 04, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Lower Resonator Trolley | 12, 24 and 60 |
|
182
|
Wednesday, June 12, 2024, 10:35 |
Riley Sykes | Trolleys serviced | Maintenance | Outriggers 1 and 2 Service | 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000 |
|
183
|
Friday, June 14, 2024, 10:04 |
Riley Sykes | Service Bridge | Maintenance | Service/ Bridge inspection | Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub |
|
184
|
Monday, June 24, 2024, 12:53 |
Riley Sykes | Elevation Jack | Maintenance | Highfield Service | Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected |
|