  80   Tuesday, February 09, 2016, 14:48 Travis CaveCyclotronStandard Operationshadow shields

All shadow shields have been installed. Ladders, the pothole covers and the second rad survey will be done tomorrow.

  81   Wednesday, February 10, 2016, 14:53 Travis CaveCyclotronStandard Operationshadow shields

All cyclotron in tank work is completed.

  84   Thursday, February 25, 2016, 11:41 Travis CaveCyclotronStandard OperationEx 2C removal

Ex 2C has been removed from the cyclotron. A trip into the tank was needed to free the probe, hung up on the usual spot.

  85   Tuesday, March 01, 2016, 13:27 Travis CaveCyclotronStandard OperationEx 2C install

EX 2C has been installed back into the cyclotron.

  88   Thursday, April 07, 2016, 11:04 Travis CaveCyclotronStandard OperationClosed the shield door

The shield door on the B2 level of the RH building has been closed.

  91   Tuesday, January 31, 2017, 14:41 Travis CaveCyclotronStandard OperationShield installation

200, 400, 500, 600, and a pallet of 700 series of shield have been installed in the cyclotron.

  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work

 All cyclotron in tank work has been completed.

  111   Tuesday, April 03, 2018, 11:57 Travis CaveCyclotronStandard OperationBlue Shield Door Shut.

 The Blue Shield Door on the B2 level of the RH building has been closed.

  136   Wednesday, January 19, 2022, 09:50 Travis CaveShieldingStandard OperationShield door is now open

 The shield door is now open on the RH B2 level.

  86   Wednesday, March 09, 2016, 17:09 Ron KuramotoCyclotronDevelopmentEX4N new housing installation

The new EX4N housing assembly drawing TEC0071 (unfinished) was installed and connected to the EX4 tank side port flange over a 3 day period from Feb29 – Mar 2, 2016. This was a hands on installation spread amongst 5 people with the total accumulated dose was 2.97 mSv.  See W/P C2016-02-29-5
 

Attached are;

- Rad field survey map.
- Updated installation procedure (rev4) with additional notes/comments during the installation  Revisions in Red.  Competed steps in Green. 
- Photo of the EX4N housing assembly.

Recent photos, are on Dimo's S drive :S\dyosifov\Extraction 4\Photos 2016

Attachment 1: dspage07994143927104268192.pdf
dspage07994143927104268192.pdf
Attachment 2: Extr_4N_Final_instalation_-_gimbal-pipe-valve.docx
Attachment 3: IMG_1886.JPG
IMG_1886.JPG
  175   Tuesday, May 14, 2024, 10:53 Riley SykesCarrierMaintenanceCarrier underrail wheels maintenance

 All 4 Under rail wheels serviced and cleaned. All Timken bearings repacked with grease. No defects in any bearing set. 4 spare Timken 02820 bearings in RH shop.

  176   Thursday, May 16, 2024, 12:33 Riley SykesService BridgeMaintenanceCenter Post Bearing

 Center post bearing on service bridge inspected, turned freely by hand and regreased with Molub-Alloy 777-1 ES

  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer

 Motor/Gearbox unit removed from carrier and fully inspected and serviced. Oil changed on May 29th using Mobil 600 W Super Cylinder Oil. No signs of wear in internal gears, recommend oil service roughly every 5 years after shutdown.

  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection

 Both outriggers were inspected and were found to be mechanically sound. No damage to components or hardware visible, will revisit with pre-inspection before shutdown period 2025.

  179   Friday, May 31, 2024, 12:47 Riley SykesTrolleys servicedMaintenanceTool Trolley Scheduled Maintenance

 60 month service completed. Bearings for drive motor wheels regreased, Reducer repacked with Molub Alloy 777-1 ES, all mechanically sound. Recommended to swap out front right drive wheel in 5 years due to minimal deteoration.

Attachment 1: Tool_Trolley_Drive_Motor.jpg
Tool_Trolley_Drive_Motor.jpg
  180   Monday, June 03, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceUpper Resonator Trolley

 24 Month, 60 month service completed. Bearings for drive motor wheels regreased and observed to move freely without load. Reducers repacked with Molub Alloy 777-1 ES. Vertical ball screw mechanism inspected and bearing change postponed due to lack of major usage, recommend change within next 5 years or service. All mechanically sound.

  181   Tuesday, June 04, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceLower Resonator Trolley

  12, 24 and 60 month service completed. Bearings for drive motor wheels regreased and observed to move freely without load. Reducers repacked with Molub Alloy 777-1 ES. Vertical ball screw scissor mechanism inspected and all operations observed to be in sound mechanical condition.

  182   Wednesday, June 12, 2024, 10:35 Riley SykesTrolleys servicedMaintenanceOutriggers 1 and 2 Service

 1,2 and 5 Year service completed. Vertical ball screws and chains inspected and regreased with Chemours Krytox EG 2000 suitable for vacuum and clean room situations. Mechanically sound, will do a once over before next shutdown period.

  183   Friday, June 14, 2024, 10:04 Riley SykesService BridgeMaintenanceService/ Bridge inspection

 Yearly, 2 Year and 5 Year service completed. All bearings on support frames turn freely and were regreased with Molub Alloy 777-1 ES. Reducer repacked as well. Reinspect pre shutdown and lubricate orbital drive chain before wiping off excess.

  184   Monday, June 24, 2024, 12:53 Riley SykesElevation JackMaintenanceHighfield Service

 Highfields 7A,7B post shutdown service complete. Oil change completed, new Mobil 600 W Super Cylinder oil added. Sample collected for RPG of used oil. Both found to be mechanically sound and stored in upper mezzanine. 