  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken ThermocoupleOn March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron
 1AQ14_FlgTC1_7Mar2019.jpeg1AQ14_FlgTC2__7Mar2019.jpeg1AQ14_FlgTC3_7Mar2019.jpeg 
  120   Thursday, April 25, 2019, 11:13 Keith C NgM20RepairM20 Q2 repair notesSee attached scan for repair notes regarding
M20 Q2 during the 2019 winter shutdown. The
repair method for M20 Q2 was instigated by
 2019_shutdown_m20_q2_repair_notes.pdf 
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shootBeamlines
shot the position of the M9 T2 port and B1
flange for setting the M9 test stand flanges
 20200224_m9project_P1040686.JPG20200224_m9project_P1040688.JPG 
  125   Friday, March 06, 2020, 13:36 Keith C NgM9RepairM9 B1 moved to warm cell The M9 B1 was removed from the M9
channel surveyed and moved to the remote
handling warm cell for refurbishment.
 2020_M9_B1_field_survey_out_of_channel.pdf 
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location.
 tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdfInkedRH1_0044_LI.jpgRH1_0046.jpgRH1_0050.jpgRH1_0049.jpg 
  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment workSet up shielding canyon for M9 laser tracker
job.
 dms.jpg 
  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off1.
Blank off installed 11:40      with Dan McDonald,
east spring ear looks 'deeper" than
 20180327_t2m9_P1030978.JPG20180327_t2m9_P1030979.JPG 
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation surveySurveyed contents of storage flask located
at TNF. The lid was lifted off roughly 12"
up and a pole monitor was swept over the
  
  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section.
 2022_4v_cm1_rh_joint_install.pdf 