  109   Thursday, February 01, 2018, 15:44 Keith C NgPrimary BeamlinesRepairq15 repairCorrection that all supply side (even numbered
insulators) ceramic insulators on Q15 have
been replaced with new old stock insulators
  
  110   Monday, February 05, 2018, 15:40 Keith C NgPrimary BeamlinesRepair1A Q15 repair.1.) Completed covering up 1A Q15.
2.) RH flask currently contains the
8 insulators removed from Q15. 3.6 mSv/h
 20180205_1aq15repair_P1030889.JPG 
  111   Wednesday, February 14, 2018, 10:36 Keith C NgPrimary BeamlinesRepair1a q12 q13Uncovered and placed bridges for 1a q12
q13 for doug's re cabling work. See WP C2018-02-13-2:
work
 P1030907.JPG 
  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken ThermocoupleOn March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron
 1AQ14_FlgTC1_7Mar2019.jpeg1AQ14_FlgTC2__7Mar2019.jpeg1AQ14_FlgTC3_7Mar2019.jpeg 
  122   Tuesday, September 24, 2019, 14:37 Keith C NgPrimary BeamlinesStandard Operationlead pig radiation surveySurveyed contents of storage flask located
at TNF. The lid was lifted off roughly 12"
up and a pole monitor was swept over the
  
  123   Thursday, October 24, 2019, 14:41 Keith C NgPrimary BeamlinesMaintenanceannotated drawing of 1A Q15 cooling headers Annotated drawing of TBP0425D attempting
to capture the repairs of 1A Q15 triplet
magnet ceramic insulator/coils over the years.
 tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-repairannotations.pdf 
  126   Thursday, March 19, 2020, 15:42 Keith C NgPrimary BeamlinesDevelopmentVault beamline beam position monitorThe Beam Position Monitor between 1VB1
and 1VM3 has been installed. The indium joints
are leak tight, however the V flanges are
  
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location.
 tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdfInkedRH1_0044_LI.jpgRH1_0046.jpgRH1_0050.jpgRH1_0049.jpg 
  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section.
 2022_4v_cm1_rh_joint_install.pdf 