  91   Wednesday, March 16, 2016, 17:19 Ron KuramotoPrimary BeamlinesDevelopment4VQ3 Removal On 8March2016, under W/P C2016-03-08-2,
4VQ3 was lifted out of BL4V with the vault
orbit crane where it was first weighed then
 IMG_1893.JPGIMG_1893.JPGIMG_1899.JPGIMG_1902.JPGIMG_1907.JPG 
  92   Wednesday, March 16, 2016, 17:57 Ron KuramotoPrimary BeamlinesDevelopment4VQ1&Q2 Removal On 14March2016, 4VQ1&Q2 were
removed from BL4V and lowered into the Vault
basement B3 level where they were stored
 13x 
  119   Tuesday, April 16, 2019, 11:19 Ron KuramotoPrimary BeamlinesRepair1AQ14 B/L Flange Broken ThermocoupleOn March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron
 1AQ14_FlgTC1_7Mar2019.jpeg1AQ14_FlgTC2__7Mar2019.jpeg1AQ14_FlgTC3_7Mar2019.jpeg 
  2   Tuesday, February 14, 2012, 16:29 Keith C NgM20Repairm20 q1 q2 repairWarm cell reconfigured for water leak repair
at coil termination. Radiation surveys done.
M20 Q1 ready for  removal of insulators.
 P1010986.JPG 
  3   Thursday, February 16, 2012, 08:08 Keith C NgM20Repairm20 q1 q2 repairInsulators # 6,7,8 removed from Q1 headers
late afternoon by C Ballard. Ready for removal
and re-brazing of #7 joint some time today.
 P1020003.JPGP1020001.JPG 
  4   Thursday, February 16, 2012, 16:22 Keith C NgM20Repairm20 q1 q2 repairOld #7 coil fitting removed, replaced and
re-brazed today by M Good. Insulators ready
to go back on to magnet coils to be pressure
 IMG_2545.JPGP1020013.JPGP1020028.JPG 
  5   Friday, February 17, 2012, 15:35 Keith C NgM20Repairm20 q1 q2 repairReinstalled ceramic insulators #6 7 8 to
Q1 magnet by C Ballard. #6 and 8 went on
with no issues. The copper tubing on insulator
 P1020033.JPGP1020037.JPGP1020038.JPGP1020035.JPGP1020031.JPG 
  6   Thursday, March 01, 2012, 16:01 Keith C NgPrimary BeamlinesRepair2C Rad Hard Valve Replacement4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream
  
  8   Thursday, October 11, 2012, 16:40 Keith C NgM9Repairm9 t2 joint repairToday:
Bridge setup complete; Noticed 12
x 3 x 3 block when placed on top of several
 20121011_RH1_01_0357.JPG20121011_RH1_02_0367.JPG20121011_RH1_02_0362.JPG20121011_RH1_02_0363.JPG 
  9   Friday, October 12, 2012, 15:12 Keith C NgM9RepairM9 T2 Joint Repair cont.Joint repair continues.
 
Leak Check:
 20121012_RH2_01_0002.JPG20121012_RH2_01_0004.JPG 
  10   Monday, October 15, 2012, 17:03 Keith C NgM9RepairM9 T2 joint repair cont.Today:
- Removed pins and removed indium
through ring. Joint fully open at 14.5 to
  
  13   Thursday, October 18, 2012, 08:26 Keith C NgM9RepairM9 T2 joint repair cont.Yesterday:
Installed indium blank off at M9
T2 joint and pumped down at 15:20 to 15:45
  
  14   Thursday, October 18, 2012, 16:28 Keith C NgM9RepairM9 T2 joint repair cont.Today:
Completed leak check of M9 T2 area:
joint(s) are He leak tight. Remote He lines
 T2_Remote_Leak_Check.PDF20121018_m9q2_waterleak.jpg 
  15   Friday, October 19, 2012, 16:48 Keith C NgM9RepairM9 T2 Joint Repair cont.Today:
Cleaned up work site and removed
extraneous poles and tooling. Radioactive
 20121019_RH1_01_0081.JPG20121019_RH1_01_0082.JPG20121019_RH2_02_0004.JPG 
  17   Monday, October 22, 2012, 15:48 Keith C NgM9RepairM9 T2 clean up and shield restorationToday;
Restoring shielding at M9 T2 area
and cleaning up RH setup.
 20121022_RH1_02_0092.JPG20121022_RH1_02_0081.JPG20121022_RH1_02_0082.JPG 
  18   Wednesday, October 24, 2012, 11:53 Keith C NgM9RepairM9 T2 blank off completeShielding around m9 t2 restored as of 11:45,
vacuum levels still the same since 19 October.
- Work permit returned.
 201211_m9t2repair.xlsx 
  19   Friday, January 11, 2013, 15:44 Keith C NgPrimary BeamlinesMaintenance1AVA8 valve o ring replacementAssisted vacuum group with removing 1AVA8:
- uncovered valve area and set up
remote handling bridge over valve.
  
  20   Monday, January 14, 2013, 16:36 Keith C NgPrimary BeamlinesMaintenance1AVA8 valve o ring replacementcontinued with o ring replacement, replaced
all relevant o ring seals on valve (valve
body seal and actuator arm dynamic seals).
  
  21   Tuesday, January 15, 2013, 16:37 Keith C NgPrimary BeamlinesMaintenance1AVA8 valve o ring replacementJob completed today and shielding block
over valve restored.
- He leak checked valve and accessible
  
  22   Wednesday, January 16, 2013, 17:03 Keith C NgPrimary BeamlinesRepair1A triplet repairMoved 18' blocks away from triplet area
in preparation for uncovering triplet. Plastic
laid down up stream of t2 target station
  