  ID Datedown Author Category Type Subject Text Attachments
  9   Friday, October 12, 2012, 15:12 Keith C NgM9RepairM9 T2 Joint Repair cont.Joint repair continues.
 
Leak Check:
 20121012_RH2_01_0002.JPG20121012_RH2_01_0004.JPG 
  8   Thursday, October 11, 2012, 16:40 Keith C NgM9Repairm9 t2 joint repairToday:
Bridge setup complete; Noticed 12
x 3 x 3 block when placed on top of several
 20121011_RH1_01_0357.JPG20121011_RH1_02_0367.JPG20121011_RH1_02_0362.JPG20121011_RH1_02_0363.JPG 
  7   Thursday, May 24, 2012, 18:59 Grant MinorM20RepairM20 front-end leak vacuum check T2/Q1/Q2/Scraper

Normal
0




false
false
false
 6x 
  6   Thursday, March 01, 2012, 16:01 Keith C NgPrimary BeamlinesRepair2C Rad Hard Valve Replacement4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream
  
  5   Friday, February 17, 2012, 15:35 Keith C NgM20Repairm20 q1 q2 repairReinstalled ceramic insulators #6 7 8 to
Q1 magnet by C Ballard. #6 and 8 went on
with no issues. The copper tubing on insulator
 P1020033.JPGP1020037.JPGP1020038.JPGP1020035.JPGP1020031.JPG 
  4   Thursday, February 16, 2012, 16:22 Keith C NgM20Repairm20 q1 q2 repairOld #7 coil fitting removed, replaced and
re-brazed today by M Good. Insulators ready
to go back on to magnet coils to be pressure
 IMG_2545.JPGP1020013.JPGP1020028.JPG 
  3   Thursday, February 16, 2012, 08:08 Keith C NgM20Repairm20 q1 q2 repairInsulators # 6,7,8 removed from Q1 headers
late afternoon by C Ballard. Ready for removal
and re-brazing of #7 joint some time today.
 P1020003.JPGP1020001.JPG 
  2   Tuesday, February 14, 2012, 16:29 Keith C NgM20Repairm20 q1 q2 repairWarm cell reconfigured for water leak repair
at coil termination. Radiation surveys done.
M20 Q1 ready for  removal of insulators.
 P1010986.JPG 
  1   Thursday, June 30, 2011, 16:58 John WongPrimary BeamlinesRepairblah blah blahdfdfdfdfdf   