9
|
Friday, October 12, 2012, 15:12 |
Keith C Ng | M9 | Repair | M9 T2 Joint Repair cont. | Joint repair continues.
Leak Check: |
|
8
|
Thursday, October 11, 2012, 16:40 |
Keith C Ng | M9 | Repair | m9 t2 joint repair | Today:
Bridge setup complete; Noticed 12
x 3 x 3 block when placed on top of several |
|
7
|
Thursday, May 24, 2012, 18:59 |
Grant Minor | M20 | Repair | M20 front-end leak vacuum check T2/Q1/Q2/Scraper |
Normal
0
false
false
false
|
6x |
6
|
Thursday, March 01, 2012, 16:01 |
Keith C Ng | Primary Beamlines | Repair | 2C Rad Hard Valve Replacement | 4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream |
|
5
|
Friday, February 17, 2012, 15:35 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Reinstalled ceramic insulators #6 7 8 to
Q1 magnet by C Ballard. #6 and 8 went on
with no issues. The copper tubing on insulator |
|
4
|
Thursday, February 16, 2012, 16:22 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Old #7 coil fitting removed, replaced and
re-brazed today by M Good. Insulators ready
to go back on to magnet coils to be pressure |
|
3
|
Thursday, February 16, 2012, 08:08 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Insulators # 6,7,8 removed from Q1 headers
late afternoon by C Ballard. Ready for removal
and re-brazing of #7 joint some time today. |
|
2
|
Tuesday, February 14, 2012, 16:29 |
Keith C Ng | M20 | Repair | m20 q1 q2 repair | Warm cell reconfigured for water leak repair
at coil termination. Radiation surveys done.
M20 Q1 ready for removal of insulators. |
|
1
|
Thursday, June 30, 2011, 16:58 |
John Wong | Primary Beamlines | Repair | blah blah blah | dfdfdfdfdf |
|