Message ID: 53     Entry time: Monday, May 30, 2022, 12:58
Author: Adam Newsome 
Category: T-Hall Crane 
Type: Development 
Subject: Reversion of South position limit to OEM value 

The position limit modification described in e-log 49 has been reverted. Currently the South soft limit is set back to 0.36m.

The limit was tested and confirmed (craned stopped at 0.33m position which is acceptable due to coasting). The entire bridge range of motion was checked to ensure there were no adverse effects - all is OK. The South bumpers need to be reinstalled - this will take place in the coming weeks.

Changes noted in crane log book.

Relevant work permit: A2022-05-30-3

 

Edit (2022-06-08): the bumpers have been re-installed.