Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 39     Entry time: Friday, December 22, 2017, 12:42
Author: Jason Kapalka 
Category: T-Hall Crane 
Type: Standard Operation 
Subject: Powered down ARIEL Target Hall Crane 

 Powered down ARIEL Target Hall Crane today by switching off main power switch on B1 level in preparation for site-wide BC Hydro power outage on Dec. 27-29.

ELOG V2.9.2-2455