39
|
Friday, December 22, 2017, 12:42 |
Jason Kapalka | T-Hall Crane | Standard Operation | Powered down ARIEL Target Hall Crane | Powered down ARIEL Target Hall Crane
today by switching off main power switch
on B1 level in preparation for site-wide |
|
|
51
|
Friday, February 18, 2022, 09:26 |
Adam Newsome | T-Hall Crane | Maintenance | Potential grease leak observed | Naimat Khan noticed after using the crane
that some grease dropped onto a spreader
bar, and believes it is a leak from the main |
|
|
27
|
Monday, January 25, 2016, 13:20 |
Allon Messenberg | T-Hall Crane | Maintenance | Possible oil leak | Two small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley. The |
|
|
76
|
Thursday, December 12, 2024, 15:57 |
Aaron Tam | Hot Cell 1 | Development | Pistons Gas lines exchange | December 12, 2024 - Chad Fisher,
Albert Kong, Aaron Tam
Tests: |
13x |
|
58
|
Friday, January 20, 2023, 14:48 |
Adam Newsome | T-Hall Crane | Standard Operation | Pendant/Receiver Communication Issue (Repeated) | An issue was observed in which the pendant
did not work to control the crane. This
is the second time in recent memory this |
|
|
55
|
Wednesday, August 24, 2022, 13:47 |
Adam Newsome | T-Hall Crane | Standard Operation | Pendant/Receiver Communication Issue | In preparing to troubleshoot the issue
described in e-log #54, the crane was power
cycled, and the pendant battery removed, |
|
|
56
|
Tuesday, December 20, 2022, 10:03 |
Adam Newsome | T-Hall Crane | Standard Operation | Overhead crane powered off for the holidays | [edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults on the HMI and it seems |
|
|
44
|
Friday, July 03, 2020, 15:43 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist: West Travel Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
|
52
|
Tuesday, March 15, 2022, 10:03 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist VFD Replaced | The North Aux Hoist VFD which had failed
(e-log 50) was replaced today by Tom Kauss
and Adam Newsome on Work Permit A2022-03-15-1. |
|
|
45
|
Wednesday, September 09, 2020, 10:51 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist Replacement (followup on E-Log 44) | See E-Log 44 for details on North Aux Hoist
failure.
A replacement VFD was ordered by |
|
|
54
|
Tuesday, August 23, 2022, 10:32 |
Adam Newsome | T-Hall Crane | Maintenance | North Aux Hoist - reverse motion axes on E/W | Update 2022-10-06: During routine
inspection of the crane, Tom Kauss investigated
the direction swap issue. It was determined |
|
|
50
|
Tuesday, February 01, 2022, 08:29 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist - West Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
|
49
|
Thursday, January 06, 2022, 10:46 |
Adam Newsome | T-Hall Crane | Development | Modification of South Limits | Edit: as of May 30, 2022, the modification
has been reversed, and the crane is functioning
normally as per the manufacturer's limits. |
|
|
8
|
Friday, December 05, 2014, 10:43 |
Isaac Earle | 100KW Beam Dump | Development | Lower Lead Shield Drain Line Installed | A 1/8" SS tube was routed from the
Swagelok fitting on the front of the lower
lead shield to the service stand water catch |
|
|
13
|
Friday, March 20, 2015, 11:45 |
Isaac Earle | 100KW Beam Dump | Development | Lower Half of BD EHDT Shielding Installed | The lower half of the beam dump EHDT
shielding was installed yesterday by Plant
Group. After installation of the service |
|
|
48
|
Tuesday, November 23, 2021, 11:01 |
Adam Newsome | T-Hall Crane | Repair | Load Cell - Not Functioning | The load cell which is located on the crane
itself to display the load to operators was
reported not working during the week of November |
|
|
63
|
Wednesday, August 02, 2023, 09:13 |
chad fisher | Hot Cell 1 | Repair | Leak Rate Testing | On August 1, 2023 HC1 was pumped down to
-1200 Pa (gauge) and then valved off to test
the leak rate after turntables had been sealed |
|
|
29
|
Wednesday, February 15, 2017, 11:57 |
chad fisher | T-Hall Crane | Development | Jason's Remote Crane Test Boxes | On Tuesday, February 14th I finished modifying
Jason's boxes for the remote crane tests
by adding shelves to mount cameras... Apart |
|
|
41
|
Tuesday, August 13, 2019, 11:43 |
Jason Kapalka | T-Hall Crane | Development | Installed surge protector | Background: On 2019-06-25 a Pri VelFdbk Loss
fault was discovered on the Main Hoist East
Drum South Motor of the ARIEL Target Hall |
|
|
5
|
Wednesday, December 03, 2014, 10:16 |
Isaac Earle | 100KW Beam Dump | Development | Installation of Lower Lead Block and Beam Dump Insert | On November 28th the lower lead shield
was installed with 3/8" shimming at
the front end, and 11/32" shimming at |
|