Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 56     Entry time: Tuesday, December 20, 2022, 10:03
Author: Adam Newsome 
Category: T-Hall Crane 
Type: Standard Operation 
Subject: Overhead crane powered off for the holidays 

[edit 2023-01-03] The crane was powered back on this morning - there do not appear to be any faults on the HMI and it seems that the crane was unaffected by the power outage.

The ARIEL target hall overhead crane was powered off for the holidays. In the new year, throw the main disconnect in the crane control room to power back on.

ELOG V2.9.2-2455