60
|
Thursday, August 01, 2024, 15:01 |
Darwin Ortiz Rosales | | | EVAP1 and EVAP2 Inspection and Maintenance | Thursday, August 01, 2024, 14:56
EVAP1: Checked seal and no
visible deterioration was observed. |
|
61
|
Thursday, August 01, 2024, 15:03 |
Darwin Ortiz Rosales | | | | Ultrasonicator in Cold Lab: The ultrasonicator
cooling lines and their operation was checked.
The functionality of the probe and operation |
|
62
|
Tuesday, October 15, 2024, 09:21 |
Darwin Ortiz Rosales | Fixed | | Hotlab glovebox catalyst regeneration | Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated.
No issues. Removed TCE and PVB from |
|
63
|
Thursday, November 21, 2024, 11:48 |
Aaron Schmidt | | | Change glove on Ar Glove box (2) | Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. |
|
64
|
Monday, December 16, 2024, 12:15 |
Aaron Schmidt | Completed | | Q4 - 2024 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
65
|
Friday, February 14, 2025, 14:17 |
Aaron Schmidt | | | Laser Cutter Inspection. | Friday, February 14, 2025, 14:16: Epilog
laser cutter operates. OK.
Blower, red dot, adjustments settings |
|
67
|
Thursday, March 20, 2025, 13:50 |
Keyur Chauhan | | | Actinide Mass Balance Calibration ISAC-I B1 Hot Lab | ISAC-1
B1 Hot Lab actinide mass balance calibration |
|