Entry  Thursday, August 01, 2024, 15:01, Darwin Ortiz Rosales, , , EVAP1 and EVAP2 Inspection and Maintenance 

Thursday, August 01, 2024, 14:56

EVAP1:  Checked seal and no visible deterioration was observed.  Oil level in roughing pump was good.  Circulated argon to observe functionality of the gloves and to check appropriate gas flow. 

EVAP2:  Visually inspected the connections at the back of the evaporator.  A loose connection had been observed on the previous day but fixed.  Roughing pump running well and system operational.  The door seal could not be checked but it is working properly as evidenced by the fact that the evaporator was in use. No major maintenance required at this moment.

Entry  Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,  

Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation software was checked.  Visual inspection of probes and water receptacle showed good operational condition. 

Entry  Tuesday, October 15, 2024, 09:21, Darwin Ortiz Rosales, Fixed, , Hotlab glovebox catalyst regeneration 

Tuesday, October 15, 2024, 09:22

The glovebox catalyst was regenerated.  No issues.  Removed TCE and PVB from inside the glovebox.  These were vestiges from the previous UCx production process.

Entry  Thursday, November 21, 2024, 11:48, Aaron Schmidt, , , Change glove on Ar Glove box (2) 

 Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove. 

No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.

Work Permit: I2024-11-21-2

Note* Changing both inner gloves is recommended later. We had considered to do both however the O2 ppm spiked after the change of the first two. We were at 185 ppm & aim to not cross 200 ppm.


Additional info:

The remaining gloves were inspected and appeared in acceptable condition.  A regeneration was performed shortly after and the gas lines, pump lines were also inspected.  This will be considered as the inspection for the current inspection cycle.

Darwin

Entry  Monday, December 16, 2024, 12:15, Aaron Schmidt, Completed, , Q4 - 2024 Ball Mill Calibration & Inspection  Q4_-_2024_Ball_Mill_Calibration&_Inspection.png

 Fritsch Pulverisette 5 Ball Mill status:

Monday, December 16, 2024, 12:12:

SN 05.6010 / 03005: Inspected. Ok. 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

Entry  Friday, February 14, 2025, 14:17, Aaron Schmidt, , , Laser Cutter Inspection. 

Friday, February 14, 2025, 14:16: Epilog laser cutter operates. OK.

Blower, red dot, adjustments settings ok. Laser used to cut Ta foil. OK.

Entry  Thursday, March 20, 2025, 13:50, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab  Actinide_Mass_Balance_-_11_Mar_2025.pdf

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%.