  24   Thursday, March 21, 2019, 07:43 Aaron Schmidt  Argon Glove box repair & link to nuclear ventilationThe Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: 
 6x 
  23   Thursday, February 07, 2019, 10:42 Aaron Schmidt  Argon Glove box leak / regeneration failure 
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019.
 7x 
  22   Monday, April 09, 2018, 15:59 Laura LambertFixed Glove box leak in hot lab Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the
 GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg 
  21   Wednesday, January 31, 2018, 13:35 Laura Lambert  New lab safety mirrors installed in hot lab Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations
 IMG_0237.JPGIMG_0239.JPG 
  20   Tuesday, January 23, 2018, 11:58 Laura Lambert  All BeO removed from Labs! Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and
  
  19   Wednesday, December 20, 2017, 09:16 Laura Lambert  RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 Wednesday, December 20, 2017, 09:02
Replaced Argon tank
  
  18   Tuesday, August 08, 2017, 14:55 Laura Lambert  Glove box Alarm Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon.
  
  17   Thursday, July 13, 2017, 15:12 Laura LambertUnder Process D.H.W leak in SEM lab Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM
 IMG_1713.JPGIMG_1715.JPGIMG_1716.JPGIMG_1719.JPG 
  16   Wednesday, April 05, 2017, 08:22 Aaron SchmidtFixed D.H.W.R LeakWhen: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the
  
  15   Thursday, March 16, 2017, 09:32 Aaron SchmidtFixed D.H.W water pipe replacementFri 03/03/2017 17:00  - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.

Wed 15/03/17 11:00
 DHW_pipe_replacement.docx 
  14   Wednesday, November 26, 2014, 14:01 Laura Lambert       
  13   Friday, March 15, 2013, 13:55 Anders Mjos  Non active water off for a short time (10 - 15 min)ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK
  
  12   Tuesday, February 28, 2012, 12:01 John Wong  TIS/RH UsersTuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog
  
  11   Thursday, February 23, 2012, 13:38 Anders MjosFixed Water leak in chemistry / cold lab Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21.
 Notes_on_water_leak_ISAC_I.docx 
  10   Thursday, September 08, 2011, 15:41 Anders MjosFixed1Evaporator#1 glovebox repairing

    

       
            
  
  9   Friday, August 19, 2011, 10:04 John WongUnder Process1Evaporator#1 glovebox repairingThe evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places).  It is evident
  
  8   Tuesday, July 19, 2011, 16:26 John WongFixed Planetary Ball Mill moved to Hotlab Tuesday, July 19, 2011, 16:22:  The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose
 Screen_shot_2011-07-19_at_4.21.04_PM.png 
  7   Friday, June 24, 2011, 18:00 John WongUnder Process TIS New Users Hi All,
As requested by Pierrer Bricault,
 I have added the following users to
 elog_demo.png 
  6   Tuesday, June 21, 2011, 16:38 John WongFixed Planetary Ball Mill Re-Commisioning Tue Jun 21 16:30:48 2011: 
Re-Cap:  On June 13, 2011, the
milling jar gasket seal partially came out
  
  5   Friday, May 13, 2011, 11:59 John WongFixed Uranium Waste Container Removed from HotlabFri May 13 11:55:37 2011:  The contain
in the uranium waste container was removed
and transferred into a beaker and sealed. 
  