Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 3 of 4  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thursday, February 07, 2019, 10:42, Aaron Schmidt, , , Argon Glove box leak / regeneration failure 7x
Entry  Monday, April 09, 2018, 15:59, Laura Lambert, Fixed, , Glove box leak in hot lab GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg
Entry  Wednesday, January 31, 2018, 13:35, Laura Lambert, , , New lab safety mirrors installed in hot lab IMG_0237.JPGIMG_0239.JPG
Entry  Tuesday, January 23, 2018, 11:58, Laura Lambert, , , All BeO removed from Labs! 
Entry  Wednesday, December 20, 2017, 09:16, Laura Lambert, , , RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 
Entry  Tuesday, August 08, 2017, 14:55, Laura Lambert, , , Glove box Alarm 
Entry  Thursday, July 13, 2017, 15:12, Laura Lambert, Under Process, , D.H.W leak in SEM lab IMG_1713.JPGIMG_1715.JPGIMG_1716.JPGIMG_1719.JPG
Entry  Wednesday, April 05, 2017, 08:22, Aaron Schmidt, Fixed, , D.H.W.R Leak 
Entry  Thursday, March 16, 2017, 09:32, Aaron Schmidt, Fixed, , D.H.W water pipe replacement DHW_pipe_replacement.docx
Entry  Wednesday, November 26, 2014, 14:01, Laura Lambert, , ,  
Entry  Friday, March 15, 2013, 13:55, Anders Mjos, , , Non active water off for a short time (10 - 15 min) 
Entry  Tuesday, February 28, 2012, 12:01, John Wong, , , TIS/RH Users 
Entry  Thursday, February 23, 2012, 13:38, Anders Mjos, Fixed, , Water leak in chemistry / cold lab Notes_on_water_leak_ISAC_I.docx
Entry  Friday, August 19, 2011, 10:04, John Wong, Under Process, 1, Evaporator#1 glovebox repairing 
    Reply  Thursday, September 08, 2011, 15:41, Anders Mjos, Fixed, 1, Evaporator#1 glovebox repairing 
Entry  Tuesday, July 19, 2011, 16:26, John Wong, Fixed, , Planetary Ball Mill moved to Hotlab Screen_shot_2011-07-19_at_4.21.04_PM.png
Entry  Friday, June 24, 2011, 18:00, John Wong, Under Process, , TIS New Users  elog_demo.png
Entry  Tuesday, June 21, 2011, 16:38, John Wong, Fixed, , Planetary Ball Mill Re-Commisioning  
Entry  Friday, May 13, 2011, 11:59, John Wong, Fixed, , Uranium Waste Container Removed from Hotlab 
Entry  Wednesday, April 13, 2011, 13:54, John Wong, , , Cloth booties now avaiable for hotlab 
Entry  Wednesday, March 30, 2011, 16:47, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down 
    Reply  Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down 
ELOG V2.9.2-2455