6
|
Tuesday, June 21, 2011, 16:38 |
John Wong | Fixed | | Planetary Ball Mill Re-Commisioning | Tue Jun 21 16:30:48 2011:
Re-Cap: On June 13, 2011, the
milling jar gasket seal partially came out |
|
13
|
Friday, March 15, 2013, 13:55 |
Anders Mjos | | | Non active water off for a short time (10 - 15 min) | ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK |
|
21
|
Wednesday, January 31, 2018, 13:35 |
Laura Lambert | | | New lab safety mirrors installed in hot lab | Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations |
|
29
|
Monday, January 13, 2020, 13:27 |
Aaron Schmidt | Under Process | | Leaking pipe in HC area | Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
|
|
54
|
Friday, February 09, 2024, 11:01 |
Aaron Schmidt | | | Laser cutter inspection | Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK |
|
30
|
Wednesday, April 08, 2020, 11:40 |
Anders Mjos | | | Lab check in | Checked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and |
|
31
|
Friday, April 24, 2020, 16:27 |
Anders Mjos | | | Lab check in |
|
|
52
|
Friday, January 19, 2024, 10:18 |
Darwin Ortiz Rosales | Fixed | | Inspection of Glovebox inside B1 L06 (hotlab) | Friday, January 19, 2024, 10:10
This is a belated entry. The
inspection was performed on December 19, |
|
47
|
Tuesday, June 20, 2023, 15:11 |
Darwin Ortiz Rosales | Fixed | | Inspection ISAC 1 B1 L06 Glovebox | On Monday June 19th, the Glove box was
inspected. Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels |
|
62
|
Tuesday, October 15, 2024, 09:21 |
Darwin Ortiz Rosales | Fixed | | Hotlab glovebox catalyst regeneration | Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated.
No issues. Removed TCE and PVB from |
|
2
|
Tuesday, April 12, 2011, 12:03 |
John Wong | | | Hot Lab Glove Box Regeneration | Tue Apr 12 12:00:52 2011: The hot
lab glove box regeneration was started yesterday
(April 11, 2011). "Before regeneration, |
|
34
|
Wednesday, August 05, 2020, 19:50 |
Darwin Ortiz Rosales | Fixed | 1 | Hot Lab Glove Box Regeneration | Wednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started. |
|
55
|
Tuesday, March 12, 2024, 15:21 |
Darwin Ortiz Rosales | Fixed | | Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab) | Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1
Normal
0
|
|
53
|
Friday, January 19, 2024, 10:20 |
Darwin Ortiz Rosales | Fixed | | Glovebox regeneration (B1 L06, Hotlab) | Friday, January 19, 2024, 10:19
This is a belated entry. The
regeneration was performed successfully on |
|
58
|
Thursday, June 20, 2024, 13:33 |
Darwin Ortiz Rosales | Fixed | | Glovebox inspection ISAC1 B1 L06 | Thursday, June 20, 2024, 13:28
All lines, pump, blower, were |
|
22
|
Monday, April 09, 2018, 15:59 |
Laura Lambert | Fixed | | Glove box leak in hot lab | Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the |
|
18
|
Tuesday, August 08, 2017, 14:55 |
Laura Lambert | | | Glove box Alarm | Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon. |
|
45
|
Thursday, February 02, 2023, 10:30 |
Aaron Schmidt | | | Eyewash & Shower Station OK | Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok. |
|
32
|
Monday, July 13, 2020, 11:07 |
Aaron Schmidt | | | Eye wash temp | Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg |
|
9
|
Friday, August 19, 2011, 10:04 |
John Wong | Under Process | 1 | Evaporator#1 glovebox repairing | The evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places). It is evident |
|