  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues
  
  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and MaintenanceEvap1:  Cleaned and checked seals. 
Oil level could not be clearly determined,
but are consulting with pump group to check.
  
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection   Fritsch  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png 
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 GloveboxOn Monday June 19th, the Glove box was
inspected.  Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels
  
  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance CalibrationISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with
 Actinide_Mass_Balance_-_18_Apr_2023.pdf 
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok.
  
  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2022_Ball_Mill_Calibration&_Inspection.png 
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection Fritsch
Pulverisette 5 Ball Mill status:
 20220712_110411.jpg 
  42   Thursday, April 07, 2022, 12:21 Aaron SchmidtFixed Ar glove box roughing pump.Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to
  
  41   Thursday, April 07, 2022, 12:00 Aaron SchmidtUnder Process Ar Glove box issue & LaC removal. Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure
  
  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supplyTomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000,
  
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage.
  
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection     Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  35   Wednesday, September 16, 2020, 10:42 Aaron Schmidt  Ball Mill troubleshoot. Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan"
  
  34   Wednesday, August 05, 2020, 19:50 Darwin Ortiz RosalesFixed1Hot Lab Glove Box RegenerationWednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started.
  
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection  Fritsch  Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  32   Monday, July 13, 2020, 11:07 Aaron Schmidt  Eye wash temp Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg
  
  31   Friday, April 24, 2020, 16:27 Anders Mjos  Lab check in


   
        
            
 20200422_154045506_iOS.jpg 