ID Date Author Status Test Subject Text Attachments
  57   Monday, April 15, 2024, 10:52 Aaron SchmidtFixed Ar Glove box RP swapped. Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is
  
  56   Wednesday, March 27, 2024, 13:42 Keyur Chauhan  Actinide Mass Balance Calibration ISAC-I B1 Hot Lab ISAC-1
B1 Hot Lab actinide mass balance calibration
 Actinide_Mass_Balance_-_27_Mar_2024.pdf 
  55   Tuesday, March 12, 2024, 15:21 Darwin Ortiz RosalesFixed Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1 


Normal
0
  
  54   Friday, February 09, 2024, 11:01 Aaron Schmidt  Laser cutter inspection Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK
  
  53   Friday, January 19, 2024, 10:20 Darwin Ortiz RosalesFixed Glovebox regeneration (B1 L06, Hotlab)Friday, January 19, 2024, 10:19 
This is a belated entry.  The
regeneration was performed successfully on
  
  52   Friday, January 19, 2024, 10:18 Darwin Ortiz RosalesFixed Inspection of Glovebox inside B1 L06 (hotlab)Friday, January 19, 2024, 10:10 
This is a belated entry.  The
inspection was performed on December 19,
  
  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection    Fritsch   
  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues
  
  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and MaintenanceEvap1:  Cleaned and checked seals. 
Oil level could not be clearly determined,
but are consulting with pump group to check.
  
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection   Fritsch  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png 
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 GloveboxOn Monday June 19th, the Glove box was
inspected.  Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels
  
  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance CalibrationISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with
 Actinide_Mass_Balance_-_18_Apr_2023.pdf 
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok.
  
  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2022_Ball_Mill_Calibration&_Inspection.png 
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection Fritsch
Pulverisette 5 Ball Mill status:
 20220712_110411.jpg 
  42   Thursday, April 07, 2022, 12:21 Aaron SchmidtFixed Ar glove box roughing pump.Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to
  
  41   Thursday, April 07, 2022, 12:00 Aaron SchmidtUnder Process Ar Glove box issue & LaC removal. Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure
  
  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supplyTomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000,
  
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 