Entry  Friday, October 16, 2020, 16:31, Luca Egoriti, Empty, , TARGET BOAT, In progress, HPOG annealing 
Friday, October 16, 2020, 11:30
 Target mounted in EVAP2. Pump down started
Friday, October 16, 2020, 12:05
Entry  Thursday, October 15, 2020, 18:51, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, heat gun plus parasitic target thermal comissioning. 
 2020-10-15 18:51 : Setup installed during the day. Pumped down to IGP1:1.5e-5T , water leak check ok. Ramping up to 100A. 
 2020-10-15 19:30 : A heating element was showing bad signs and failed very early. ramping down and venting. 
Entry  Tuesday, October 13, 2020, 11:15, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, foil heating 
 2020-10-13 11:13 Target was left under vacuum over the weekend. IGP1: 1.6e-7T water on- leak check ok. Ramping up 2A/30s to 100A.
 2020-10-13 11:47 All ok at 100A. Ramping up, 1A/10s to 200A.
 2020-10-13 12:08 All ok at 200A. Temp tc on foil 200degC. Ramping up, 1A/10s to 300A.
Entry  Friday, October 09, 2020, 09:50, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, Tests, radiation gun for parasitic target 
 2020-10-09 9:48 The target was installed the day before and left pumping over night. IGP1=4.7e-7Torr. leak check when water on, ok. Setting ramp
up
 2020-10-09 10:16 Ramping up the target to 50A, 1.5A/30s. All good. Going to 200A same rate.
Entry  Wednesday, October 07, 2020, 12:25, Aaron Schmidt, , , , In progress, IEVAP2:TP1 Swap out. 
 Wednesday, October 07, 2020
TP1 was not spinning up past 4krpm. Stalling & tripping out. Examined with Vacuum group, appears to be starting to seize. Exchange turbo pump.
Serial# 500937
Entry  Tuesday, October 06, 2020, 14:23, Aaron Schmidt, Ta, 44508-1, LP-SIS, In progress, Conditioning Ta#61 
Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Monday, September 28, 2020, 11:53, John Wong, np-SiC, , TARGET BOAT, In progress, np-SiC carbonization 
Monday, September 28, 2020, 11:49
6 discs of np-SiC were loaded to the target boat wrapped with 3 layers of heat shields.
Desired temperature at 1500 C, (As per e-log 414/416, TGHT = 450A/7.31V, 3.28kW) 
Entry  Friday, September 25, 2020, 10:32, Darwin Ortiz Rosales, Nb, , TARGET BOAT, Done, Heat Treatment of Nb for Edward 
Friday, September 25, 2020, 10:30 
Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1400
C for 4 hrs.
    Reply  Monday, September 28, 2020, 09:36, John Wong, Nb, , TARGET BOAT, Done, Heat Treatment of Nb for Edward 


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            Friday, September 25, 2020, 10:30 
Entry  Thursday, September 24, 2020, 13:37, Aaron Schmidt, Nb, , TARGET BOAT, , Nb Test SRF group 
Sample loaded into a vertical target boat. Flex line HS removed, SS waterline HS installed -AS.
Thursday, September 24, 2020, 13:22: Roughing.
Thursday, September 24, 2020, 13:54: Turbo pump on. 
Entry  Monday, September 21, 2020, 17:01, Marla Cervantes, , 44139-8-SK, TARGET BOAT, Done, Conditioning graphite target #3 Voltage-Increment.JPGConditioning-C-3.JPG
 Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite slurry were loaded in a tantalum tube, the tantalum tube was wrapped with 3 Ta heat shields and installed
in the EVAP, to measure the temperature, a pack of 4 Ta foils were inserted in each side of the tube.
Entry  Thursday, September 17, 2020, 16:11, Marla Cervantes, Empty, 44139-9, LP-SIS, Done, TaC coating/sintering 
 Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers, and installed in the EVAP2
Desired temperature= 1900 C, Omega Slope = 0.990
Entry  Thursday, September 10, 2020, 07:53, Aaron Schmidt, Empty, 41790-8, LP-FEBIAD, Done, Fernando FEBIAD / Anode testing. 
 FEBIAD installed. Anode PS installed. ANODE connected!.
Leak check
Thursday, September 10, 2020, 07:46: Vacuum @ 6.30e-07T
Entry  Saturday, September 05, 2020, 21:33, Marla Cervantes, Empty, , , Done, Pristine Ta tube calibration 
Saturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3 tantalum foils,
a tantalum cap was inserted in both sides of the Ta tube, the caps weren't sealed.
Entry  Monday, August 31, 2020, 12:57, Marla Cervantes, , 44489-15 , , Done, TaC coating heating test 
 Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding), previously coated with TaC was set under vacuum, 
and it will be kept at 2000 °C for 3 days to later identify the TaC's carbon penetration.
Entry  Sunday, August 30, 2020, 18:28, Marla Cervantes, Empty, 44489-13, , Done, TaC coating/sintering 
 Sunday, August 30, 2020, 06:47
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta cap was inserted to the end of the tube to be able to measure the temperature during heating
Entry  Wednesday, August 26, 2020, 10:27, Marla Cervantes, , 44489-8, , Done, C-Cartridge test #2 
 Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with a C-cartridge
Currently, the tube is under vacuum and it will be heated to 2000 °C during 3 days.
Entry  Saturday, August 22, 2020, 11:44, Marla Cervantes, , 44489-11, , Done, C-Cartridge test#1 
Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC and sintered, then it was loaded with a c-cartridge
Now is currently under vacuum and it will be heated to 2000 °C during 3 days
Entry  Tuesday, August 18, 2020, 10:41, Marla Cervantes, TaC, 44489-11, , Done, TaC coating/sintering  
Thursday, August 19, 2020, 17:28
 A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Entry  Tuesday, August 18, 2020, 09:26, Marla Cervantes, TaC, 44489-15, TARGET BOAT, Done, TaC coating/sintering  
 Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Entry  Wednesday, August 12, 2020, 11:57, Marla Cervantes, Empty, 44489-9, TARGET BOAT, Done, Pristine Ta tube calibration 
 Short oven loaded with additional hardware are spacers into the flex-line HS.
A Ta short tube was wrapped with 3 tantalum foils,
a tantalum cap was inserted in both sides of the Ta tube, the caps weren't sealed.