ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
282
|
Monday, March 14, 2016, 19:22 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning. |
283
|
Friday, March 18, 2016, 17:13 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end. |
284
|
Monday, March 21, 2016, 18:57 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A. |
285
|
Tuesday, March 22, 2016, 11:31 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
286
|
Thursday, March 24, 2016, 11:32 |
John Wong | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
Thursday, March 24, 2016, 11:29
Target was removed from the Evaporator.
The thermocouples broke off.
Need to insert Re foil prior to installing
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
John Wong wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
Thursday, March 24, 2016, 11:29
Target was removed from the Evaporator.
The thermocouples broke off.
Need to insert Re foil prior to installing
|
Tuesday, April 19, 2016, 09:28: Uploaded thermoucouple data. |
Attachment 1: 2016-03-11_Evaporator_2.4ch
|
°C Date Time T1 - C T2 - C T3 - C T4 - C
1 2016/03/11 14:25:25 21.1 24.7
2 2016/03/11 14:25:55 25.0 24.8
3 2016/03/11 14:26:25 21.6 - - -
4 2016/03/11 14:26:55 21.0 - - -
5 2016/03/11 14:27:25 21.3 - - -
6 2016/03/11 14:27:55 21.1 - - -
7 2016/03/11 14:28:25 21.1 - - -
8 2016/03/11 14:28:55 21.0 - - -
9 2016/03/11 14:29:25 21.1 - - -
10 2016/03/11 14:29:55 21.1 - - -
11 2016/03/11 14:30:25 21.1 - - -
12 2016/03/11 14:30:55 21.1 - - -
13 2016/03/11 14:31:25 21.1 - - -
14 2016/03/11 14:31:55 21.1 - - -
15 2016/03/11 14:32:25 21.1 - - -
16 2016/03/11 14:32:55 21.1 - - -
17 2016/03/11 14:33:25 20.0 - - -
18 2016/03/11 14:33:55 20.2 - - -
19 2016/03/11 14:34:25 20.8 - - -
20 2016/03/11 14:34:55 20.8 - - -
21 2016/03/11 14:35:25 21.1 - - -
22 2016/03/11 14:35:55 19.7 - - -
23 2016/03/11 14:36:25 20.8 - - -
24 2016/03/11 14:36:55 20.7 - - -
25 2016/03/11 14:37:25 21.3 - - -
26 2016/03/11 14:37:55 21.1 - - -
27 2016/03/11 14:38:25 21.2 - - -
28 2016/03/11 14:38:55 20.2 - - -
29 2016/03/11 14:39:25 20.7 - - -
30 2016/03/11 14:39:55 20.8 - - -
31 2016/03/11 14:40:25 21.3 - - -
32 2016/03/11 14:40:55 19.7 - - -
33 2016/03/11 14:41:25 20.8 - - -
34 2016/03/11 14:41:55 20.8 - - -
35 2016/03/11 14:42:25 20.8 - - -
36 2016/03/11 14:42:55 20.8 - - -
37 2016/03/11 14:43:25 20.8 - - -
38 2016/03/11 14:43:55 20.8 - - -
39 2016/03/11 14:44:25 20.8 - - -
40 2016/03/11 14:44:55 20.2 - - -
41 2016/03/11 14:45:25 20.8 - - -
42 2016/03/11 14:45:55 21.3 - - -
43 2016/03/11 14:46:25 20.8 - - -
44 2016/03/11 14:46:55 20.4 - - -
45 2016/03/11 14:47:25 20.8 - - -
46 2016/03/11 14:47:55 20.8 - - -
47 2016/03/11 14:48:25 20.8 - - -
48 2016/03/11 14:48:55 20.3 - - -
49 2016/03/11 14:49:25 20.4 - - -
50 2016/03/11 14:49:55 19.9 - - -
51 2016/03/11 14:50:25 20.4 - - -
52 2016/03/11 14:50:55 20.8 - - -
53 2016/03/11 14:51:25 20.5 - - -
54 2016/03/11 14:51:55 20.4 - - -
55 2016/03/11 14:52:25 20.5 - - -
56 2016/03/11 14:52:55 20.4 - - -
57 2016/03/11 14:53:25 20.8 - - -
58 2016/03/11 14:53:55 20.8 - - -
59 2016/03/11 14:54:25 20.3 - - -
60 2016/03/11 14:54:55 19.8 - - -
61 2016/03/11 14:55:25 20.3 - - -
62 2016/03/11 14:55:55 20.4 - - -
63 2016/03/11 14:56:25 21.3 - - -
64 2016/03/11 14:56:55 21.3 - - -
65 2016/03/11 14:57:25 20.5 - - -
66 2016/03/11 14:57:55 21.3 - - -
67 2016/03/11 14:58:25 21.3 - - -
68 2016/03/11 14:58:55 20.4 - - -
69 2016/03/11 14:59:25 20.0 - - -
70 2016/03/11 14:59:55 20.4 - - -
71 2016/03/11 15:00:25 19.8 - - -
72 2016/03/11 15:00:55 19.8 - - -
73 2016/03/11 15:01:25 19.8 - - -
74 2016/03/11 15:01:55 20.4 - - -
75 2016/03/11 15:02:25 20.4 - - -
76 2016/03/11 15:02:55 20.3 - - -
77 2016/03/11 15:03:25 21.2 - - -
78 2016/03/11 15:03:55 20.0 - - -
79 2016/03/11 15:04:25 21.0 - - -
80 2016/03/11 15:04:55 20.5 - - -
81 2016/03/11 15:05:25 20.0 - - -
82 2016/03/11 15:05:55 20.5 - - -
83 2016/03/11 15:06:25 20.5 - - -
84 2016/03/11 15:06:55 21.4 - - -
85 2016/03/11 15:07:25 21.4 - - -
86 2016/03/11 15:07:55 20.5 - - -
87 2016/03/11 15:08:25 20.5 - - -
88 2016/03/11 15:08:55 20.5 - - -
89 2016/03/11 15:09:25 21.4 - - -
90 2016/03/11 15:09:55 20.5 - - -
91 2016/03/11 15:10:25 21.0 - - -
92 2016/03/11 15:10:55 21.0 - - -
93 2016/03/11 15:11:25 20.0 - - -
94 2016/03/11 15:11:55 21.0 - - -
95 2016/03/11 15:12:25 21.0 - - -
96 2016/03/11 15:12:55 20.5 - - -
97 2016/03/11 15:13:25 21.0 - - -
98 2016/03/11 15:13:55 20.5 - - -
99 2016/03/11 15:14:25 20.5 - - -
100 2016/03/11 15:14:55 20.5 - - -
101 2016/03/11 15:15:25 20.0 - - -
102 2016/03/11 15:15:55 21.0 - - -
103 2016/03/11 15:16:25 21.0 - - -
104 2016/03/11 15:16:55 19.9 - - -
105 2016/03/11 15:17:25 21.0 - - -
106 2016/03/11 15:17:55 21.4 - - -
107 2016/03/11 15:18:25 20.8 - - -
108 2016/03/11 15:18:55 20.5 - - -
109 2016/03/11 15:19:25 21.0 - - -
110 2016/03/11 15:19:55 20.0 - - -
111 2016/03/11 15:20:25 19.9 - - -
112 2016/03/11 15:20:55 21.4 - - -
113 2016/03/11 15:21:25 20.8 - - -
114 2016/03/11 15:21:55 20.8 - - -
115 2016/03/11 15:22:25 20.8 - - -
116 2016/03/11 15:22:55 20.3 - - -
117 2016/03/11 15:23:25 21.3 - - -
118 2016/03/11 15:23:55 20.8 - - -
119 2016/03/11 15:24:25 20.8 - - -
120 2016/03/11 15:24:55 20.4 - - -
121 2016/03/11 15:25:25 21.0 - - -
122 2016/03/11 15:25:55 20.5 - - -
123 2016/03/11 15:26:25 20.4 - - -
124 2016/03/11 15:26:55 20.8 - - -
125 2016/03/11 15:27:25 21.3 - - -
126 2016/03/11 15:27:55 21.3 - - -
127 2016/03/11 15:28:25 20.8 - - -
128 2016/03/11 15:28:55 21.3 - - -
129 2016/03/11 15:29:25 21.3 - - -
130 2016/03/11 15:29:55 20.7 - - -
131 2016/03/11 15:30:25 21.3 - - -
132 2016/03/11 15:30:55 21.3 - - -
133 2016/03/11 15:31:25 20.8 - - -
134 2016/03/11 15:31:55 20.7 - - -
135 2016/03/11 15:32:25 21.3 - - -
136 2016/03/11 15:32:55 21.3 - - -
137 2016/03/11 15:33:25 20.8 - - -
138 2016/03/11 15:33:55 20.8 - - -
139 2016/03/11 15:34:25 20.8 - - -
140 2016/03/11 15:34:55 19.9 - - -
141 2016/03/11 15:35:25 21.3 - - -
142 2016/03/11 15:35:55 20.8 - - -
143 2016/03/11 15:36:25 20.8 - - -
144 2016/03/11 15:36:55 21.3 - - -
145 2016/03/11 15:37:25 20.4 - - -
146 2016/03/11 15:37:55 20.2 - - -
147 2016/03/11 15:38:25 21.3 - - -
148 2016/03/11 15:38:55 20.7 - - -
149 2016/03/11 15:39:25 20.8 - - -
150 2016/03/11 15:39:55 20.8 - - -
151 2016/03/11 15:40:25 20.7 - - -
152 2016/03/11 15:40:55 20.3 - - -
153 2016/03/11 15:41:25 20.8 - - -
154 2016/03/11 15:41:55 19.8 - - -
155 2016/03/11 15:42:25 19.7 - - -
156 2016/03/11 15:42:55 21.2 - - -
157 2016/03/11 15:43:25 20.7 - - -
158 2016/03/11 15:43:55 20.2 - - -
159 2016/03/11 15:44:25 20.8 - - -
160 2016/03/11 15:44:55 20.7 - - -
161 2016/03/11 15:45:25 20.8 - - -
162 2016/03/11 15:45:55 21.3 - - -
163 2016/03/11 15:46:25 20.8 - - -
164 2016/03/11 15:46:55 20.2 - - -
165 2016/03/11 15:47:25 21.3 - - -
166 2016/03/11 15:47:55 20.8 - - -
167 2016/03/11 15:48:25 21.3 - - -
168 2016/03/11 15:48:55 21.3 - - -
169 2016/03/11 15:49:25 21.3 - - -
170 2016/03/11 15:49:55 20.8 - - -
171 2016/03/11 15:50:25 19.8 - - -
172 2016/03/11 15:50:55 20.8 - - -
173 2016/03/11 15:51:25 21.3 - - -
174 2016/03/11 15:51:55 19.7 - - -
175 2016/03/11 15:52:25 20.8 - - -
176 2016/03/11 15:52:55 20.8 - - -
177 2016/03/11 15:53:25 20.4 - - -
178 2016/03/11 15:53:55 20.8 - - -
179 2016/03/11 15:54:25 21.3 - - -
180 2016/03/11 15:54:55 21.3 - - -
181 2016/03/11 15:55:25 20.8 - - -
182 2016/03/11 15:55:55 20.8 - - -
183 2016/03/11 15:56:25 20.4 - - -
184 2016/03/11 15:56:55 19.8 - - -
185 2016/03/11 15:57:25 21.3 - - -
186 2016/03/11 15:57:55 21.3 - - -
187 2016/03/11 15:58:25 21.3 - - -
188 2016/03/11 15:58:55 20.4 - - -
189 2016/03/11 15:59:25 21.3 - - -
190 2016/03/11 15:59:55 20.8 - - -
191 2016/03/11 16:00:25 20.8 - - -
192 2016/03/11 16:00:55 19.7 - - -
193 2016/03/11 16:01:25 20.3 - - -
194 2016/03/11 16:01:55 21.3 - - -
195 2016/03/11 16:02:25 20.8 - - -
196 2016/03/11 16:02:55 21.3 - - -
197 2016/03/11 16:03:25 21.3 - - -
198 2016/03/11 16:03:55 20.8 - - -
199 2016/03/11 16:04:25 20.2 - - -
200 2016/03/11 16:04:55 21.3 - - -
201 2016/03/11 16:05:25 20.2 - - -
202 2016/03/11 16:05:55 20.2 - - -
203 2016/03/11 16:06:25 20.3 - - -
204 2016/03/11 16:06:55 20.2 - - -
205 2016/03/11 16:07:25 19.7 - - -
206 2016/03/11 16:07:55 21.3 - - -
207 2016/03/11 16:08:25 19.7 - - -
208 2016/03/11 16:08:55 21.3 - - -
209 2016/03/11 16:09:25 20.8 - - -
210 2016/03/11 16:09:55 20.8 - - -
211 2016/03/11 16:10:25 20.8 - - -
212 2016/03/11 16:10:55 21.3 - - -
213 2016/03/11 16:11:25 21.3 - - -
214 2016/03/11 16:11:55 21.3 - - -
215 2016/03/11 16:12:25 20.8 - - -
216 2016/03/11 16:12:55 20.8 - - -
217 2016/03/11 16:13:25 20.1 - - -
218 2016/03/11 16:13:55 20.2 - - -
219 2016/03/11 16:14:25 21.3 - - -
220 2016/03/11 16:14:55 21.3 - - -
221 2016/03/11 16:15:25 20.8 - - -
222 2016/03/11 16:15:55 20.8 - - -
223 2016/03/11 16:16:25 20.3 - - -
224 2016/03/11 16:16:55 21.1 - - -
225 2016/03/11 16:17:25 20.8 - - -
226 2016/03/11 16:17:55 20.3 - - -
227 2016/03/11 16:18:25 20.3 - - -
228 2016/03/11 16:18:55 20.6 - - -
229 2016/03/11 16:19:25 19.8 - - -
230 2016/03/11 16:19:55 20.2 - - -
231 2016/03/11 16:20:25 20.8 - - -
232 2016/03/11 16:20:55 20.6 - - -
233 2016/03/11 16:21:25 21.3 - - -
234 2016/03/11 16:21:55 20.6 - - -
235 2016/03/11 16:22:25 20.8 - - -
236 2016/03/11 16:22:55 20.8 - - -
237 2016/03/11 16:23:25 21.1 - - -
238 2016/03/11 16:23:55 20.8 - - -
239 2016/03/11 16:24:25 20.4 - - -
240 2016/03/11 16:24:55 20.2 - - -
241 2016/03/11 16:25:25 21.3 - - -
242 2016/03/11 16:25:55 20.8 - - -
243 2016/03/11 16:26:25 20.4 - - -
244 2016/03/11 16:26:55 20.8 - - -
245 2016/03/11 16:27:25 19.8 - - -
246 2016/03/11 16:27:55 19.9 - - -
247 2016/03/11 16:28:25 20.2 - - -
248 2016/03/11 16:28:55 20.8 - - -
249 2016/03/11 16:29:25 20.8 - - -
250 2016/03/11 16:29:55 21.3 - - -
251 2016/03/11 16:30:25 21.1 - - -
252 2016/03/11 16:30:55 20.8 - - -
253 2016/03/11 16:31:25 21.3 - - -
254 2016/03/11 16:31:55 21.3 - - -
255 2016/03/11 16:32:25 21.3 - - -
256 2016/03/11 16:32:55 20.8 - - -
257 2016/03/11 16:33:25 21.1 - - -
258 2016/03/11 16:33:55 20.8 - - -
259 2016/03/11 16:34:25 20.3 - - -
260 2016/03/11 16:34:55 21.2 - - -
261 2016/03/11 16:35:25 20.8 - - -
262 2016/03/11 16:35:55 20.8 - - -
263 2016/03/11 16:36:25 20.8 - - -
264 2016/03/11 16:36:55 21.3 - - -
265 2016/03/11 16:37:25 21.3 - - -
266 2016/03/11 16:37:55 21.3 - - -
267 2016/03/11 16:38:25 21.3 - - -
268 2016/03/11 16:38:55 19.8 - - -
269 2016/03/11 16:39:25 20.2 - - -
270 2016/03/11 16:39:55 20.8 - - -
271 2016/03/11 16:40:25 20.8 - - -
272 2016/03/11 16:40:55 20.8 - - -
273 2016/03/11 16:41:25 20.8 - - -
274 2016/03/11 16:41:55 20.8 - - -
275 2016/03/11 16:42:25 21.3 - - -
276 2016/03/11 16:42:55 21.3 - - -
277 2016/03/11 16:43:25 20.7 - - -
278 2016/03/11 16:43:55 20.2 - - -
279 2016/03/11 16:44:25 20.3 - - -
280 2016/03/11 16:44:55 20.4 - - -
281 2016/03/11 16:45:25 20.2 - - -
282 2016/03/11 16:45:55 20.2 - - -
283 2016/03/11 16:46:25 21.3 - - -
284 2016/03/11 16:46:55 20.8 - - -
285 2016/03/11 16:47:25 20.8 - - -
286 2016/03/11 16:47:55 20.8 - - -
287 2016/03/11 16:48:25 20.7 - - -
288 2016/03/11 16:48:55 20.8 - - -
289 2016/03/11 16:49:25 19.9 - - -
290 2016/03/11 16:49:55 20.2 - - -
291 2016/03/11 16:50:25 21.3 - - -
292 2016/03/11 16:50:55 21.3 - - -
293 2016/03/11 16:51:25 20.5 - - -
294 2016/03/11 16:51:55 21.3 - - -
295 2016/03/11 16:52:25 21.3 - - -
296 2016/03/11 16:52:55 21.3 - - -
297 2016/03/11 16:53:25 20.8 - - -
298 2016/03/11 16:53:55 20.5 - - -
299 2016/03/11 16:54:25 20.5 - - -
... 53646 more lines ...
|
Attachment 2: 2016-03-11_Evaporator_2.xlsx
|
310
|
Tuesday, July 26, 2016, 16:53 |
Laura Lambert | Ta | 41369-6 | HP-SIS | Done | Conditioning Ta#49 | Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened, no leaks detected.
tapped up manually to 35A
vacuum stable = 3.8e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints at 230A for the TBHT and 600A for the TGHT.
Final desired temperature = 1800C
Wednesday, July 27, 2016, 09:20
IGP1 = 6.3e-7 Torr, vacuum stable.
TGHT = 232A, 2.7V
TBHT = 131A, 1.76V
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Wednesday, July 27, 2016, 15:46
TGHT = 600A, 8.87V
TBHT = 230A, 3.7V
IGP1 = 1.37e-6 Torr
OMEGA = 1640C
Increased max TGHT voltage to 12V
Tapped up manually to OMEGA = 1810C
TGHT = 675A, 10.21V
IGP1 = 2.2e-6 Torr
Will remain at max setpoints for the rest of the week and cool down over weekend.
Thursday, July 28, 2016, 08:34
TGHT = 675A, 10.41V
OMEGA = 1833C
Tapped down to 660A, 10.09V
OMEGA = 1805C
Friday, July 29, 2016, 13:57
OMEGA = 1814C
TGHT = 660A, 10.16V
TBHT = 230A, 3.72V
IGP1 = 3.43e-7 Torr
evap2 has remained at max setpoints for ~42hrs
conditioning complete.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, August 02, 2016, 13:39
vented in air and removed from evap2 this morning.
target looks good!
|
328
|
Friday, October 07, 2016, 16:42 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 | Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 47.6889g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Attachment 1: Ta#50_no_endcaps_3xh.s..xlsx
|
329
|
Wednesday, October 12, 2016, 21:18 |
John Wong | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 |
Laura Lambert wrote: |
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Wednesday, October 12, 2016, 21:14
Current status before cooling down:
TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C
Vacuum at 4.05 e-7 Torr.
Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT
|
330
|
Thursday, October 13, 2016, 17:32 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Conditioning Ta#50 |
John Wong wrote: |
Laura Lambert wrote: |
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Wednesday, October 12, 2016, 21:14
Current status before cooling down:
TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C
Vacuum at 4.05 e-7 Torr.
Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT
|
Thursday, October 13, 2016, 17:32
vented in air and opened up this morning.
target looks good. |
331
|
Thursday, October 13, 2016, 18:05 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 | Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
Both endcaps inserted and expanded.
Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]
Chamber pumped down.
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 5e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Friday, October 14, 2016, 13:28
TGHT and TBHT had reached 300A/ 230A respectively.
Power bump ~10min ago caused evap2 to trip off.
Tapped back up manually to 35A.
Re-initiating auto ramp now.
|
332
|
Saturday, October 15, 2016, 12:42 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
Laura Lambert wrote: |
Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
Both endcaps inserted and expanded.
Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]
Chamber pumped down.
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 5e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Friday, October 14, 2016, 13:28
TGHT and TBHT had reached 300A/ 230A respectively.
Power bump ~10min ago caused evap2 to trip off.
Tapped back up manually to 35A.
Re-initiating auto ramp now.
|
Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>
Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A. |
333
|
Sunday, October 16, 2016, 17:55 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
Aurelia Laxdal wrote: |
Laura Lambert wrote: |
Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
Both endcaps inserted and expanded.
Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]
Chamber pumped down.
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 5e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Friday, October 14, 2016, 13:28
TGHT and TBHT had reached 300A/ 230A respectively.
Power bump ~10min ago caused evap2 to trip off.
Tapped back up manually to 35A.
Re-initiating auto ramp now.
|
Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>
Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.
|
Sunday October 16: the target temperature measurements up to 620A/230A were performed today not on October 15 (yesterday, it was cooled down before reaching 300A/230A). Currently the target is cooling down, to be ready tomorrow morning for the Test Stand. |
334
|
Tuesday, October 18, 2016, 09:23 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Temperature measurements for Ta#50 |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Laura Lambert wrote: |
Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
Both endcaps inserted and expanded.
Rh foil inserted [when inserting, the Ta rod used to expand the Rh foil inside the ionizer tube snapped off inside the container - this piece was able to be shaken out and is no longer inside]
Chamber pumped down.
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 5e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Friday, October 14, 2016, 13:28
TGHT and TBHT had reached 300A/ 230A respectively.
Power bump ~10min ago caused evap2 to trip off.
Tapped back up manually to 35A.
Re-initiating auto ramp now.
|
Friday October 14: the target was ramp up to 300A/230A after Laura started it. Then, I cooled down at 6pm before leaving TRIUMF. <br>
Saturday October 15: restated the auto-ramp for Ta#50 in EVAP2. It's currently set to go to 300A/230A.
|
Sunday October 16: the target temperature measurements up to 620A/230A were performed today not on October 15 (yesterday, it was cooled down before reaching 300A/230A). Currently the target is cooling down, to be ready tomorrow morning for the Test Stand.
|
Monday, October 17, 2016, 09:21
Vented in air and taken out this morning.
Target looks good!
|
341
|
Friday, December 16, 2016, 14:14 |
Laura Lambert | Ta | 39530-3 | LP-FEBIAD | Done | Conditioning Ta FEBIAD target for shutdown tests | Friday, December 16, 2016, 14:08
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 45.9091g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
3x Ta Heat shields.
LP-FEBIAD container with large center block.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 350A at 2.0A/min.
Final desired temperature = 1900C
Friday, December 16, 2016, 14:32
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2.1e-6 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Monday, December 19, 2016, 11:52
Tapped up manually to ~1900C [see attached excel for details on data collected - interesting temperature fluctuations]
Will remain at max setpoints for min 4hrs then auto-cool
Monday, December 19, 2016, 15:20
Target has remained at max setpoints for just over 4hrs
TGHT = 520A, 8.67V
OMEGA = 1820C
IGP1 = 5.2e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, December 20, 2016, 11:52
Vented in air and opened up this morning.
Looks like the windows was coated in evap2, unsure if this was missed and coated before conditioning target or if this is from materials coming out during conditioning process...
Target looks good.
Endcaps inserted but not expanded.
|
Attachment 1: Ta-FEBIAD.xlsx
|
Attachment 2: Evernote_Camera_Roll_20161220_145947.jpg
|
|
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield foils and installed by JW
Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T
Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.
Monday, March 13, 2017, 15:54: Started auto-ramping to TGHT / TBHT 150 / 75 A at 1 / 0.5 A/min. Good/bad vacuum 3 / 4 E-5 Torr
Tuesday, March 14, 2017, 08:23: Continue auto-ramping to TGHT / TBHT 300 / 150 A. Vacuum stable at IG1 2.3E-7 T
Tuesday, March 14, 2017, 11:18: Continue auto-ramping to TGHT / TBHT 350 / 200 A. Vacuum stable at IG1 3.8E-7 T
Wednesday, March 15, 2017, 08:31: Continue auto-ramping to TGHT 375. Vacuum stable at IG1 2.5E-7 T. Omega at 1500 C
Wednesday, March 15, 2017, 16:34: Continue auto-ramping to TGHT 500. Vacuum increased to IG1 5.5E-7 T. Omega at 1887 C
Thursday, March 16, 2017, 08:34: Continue auto-ramping to TGHT 520. Vacuum increased to IG1 3.3E-7 T. Omega at 1888 C
Thursday, March 16, 2017, 08:48: TGHT at 521 A 8.99 V. Omega at 1899 C
Friday, March 17, 2017, 08:25: TGHT at 521 A 8.88 V. Omega at 1886 C. Vacuum IG1 2.5E-7 Torr
Ramping down
Wednesday, March 22, 2017, 08:42: Turbo pump stopped |
372
|
Tuesday, May 30, 2017, 14:40 |
Laura Lambert | Ta | 42218-14 | LP-SIS | Done | Conditioning Ta#52 | Tuesday, May 30, 2017, 14:36
Target consists of 400 discs.
Total packed length 2.9cm [exactly 8.05cm space on both sides]
Total mass 42.8228g [Incl foils + Ta wire on 4 packs]
Target consists of 320 single discs and 4x20 packs of Ta discs
Discs in target are arranged as follows: 80singles / 1pack / 80singles / 2packs / 80singles / 1pack / 80singles
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 350A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Windows cleaned.
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
Wednesday, May 31, 2017, 09:47
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
Vacuum stable.
IGP1 = 4.58e-7 Torr
IGP2 = 3.68e-7 Torr
Initiating auto ramp.
Wednesday, May 31, 2017, 14:07
IGP1 = 1.11e-6 Torr
IGP2 = 1.13e-6 Torr
TGHT = 354A, 5.45V
TBHT =233A, 4.01V
OMEGA = 1565C
Increasing max setpoint to 400A at same ramping rate.
Wednesday, May 31, 2017, 14:41
IGP1 = 1.19e-6 Torr
IGP2 = 1.24e-6 Torr
TGHT = 401A, 6.37V
OMEGA = 1708C
Increasing max setpoint to 425A at same ramping rate.
Wednesday, May 31, 2017, 15:51
Tapped up to ~1900C
TGHT = 480A, 7.85V
TBHT = 230A, 4.06V
OMEGA = 1912C
IGP1 = 1.85e-6 Torr
IGP2 = 2.06e-6 Torr
Will remain at max setpoints for a couple days before cooling
Friday, June 02, 2017, 13:19
Remained at max setpoint for 2days
TGHT = 480A, 7.85V
TBHT = 230A, 4.06V
OMEGA = 1885C
IGP1 = 2.15e-7 Torr
IGP2 = 2.07e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Monday, June 05, 2017, 15:18
Vented in air and taken out this morning.
Target looks good
Wednesday, June 07, 2017, 15:41
Endcaps inserted.
Ta heat shield removed.
Rh foil inserted.
Handed off to assembly.
|
377
|
Tuesday, June 20, 2017, 16:07 |
Laura Lambert | Ta | 42218-6 | HP-SIS | Done | Conditioning Ta#53 | Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 50.3105g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
1 long Ta Heat shield.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
*Note: container accidentally engraved with WO#412218-6 when it should be WO#42218-6
Wednesday, June 21, 2017, 10:05
HS water valves opened, no leaks detected.
Tapped up manually to 40A, vacuum stable.
IGP1 = 5.53e-7 Torr
IGP2 = 4.35e-7 Torr
Initiating auto-ramp.
Wednesday, June 21, 2017, 14:48
TGHT stopped at 575A due to voltage limit sitting at 9V
Increased max setpoint of voltage to 14V.
Re-started auto-ramp starting at 575A.
Wednesday, June 21, 2017, 15:23
TGHT = 600A, 8.95V
TBHT = 230A, 3.72V
IGP1 = 1.55e-6 Torr
IGP2 = 1.62e-6 Torr
OMEGA = 1538C
Increasing max setpoint of TGHT to 700A
Wednesday, June 21, 2017, 16:21
TGHT = 700A, 10.57V
TBHT = 230A, 3.75V
IGP1 = 2.2e-6 Torr
IGP2 = 2.4e-6 Torr
OMEGA = 1730C
Increasing max setpoint of TGHT to 750A
Friday, June 23, 2017, 15:41
TGHT = 780A, 11.77V
TBHT = 230A, 3.77V
IGP1 = 4.8e-7 Torr
IGP2 = 4.8e-7 Torr
OMEGA = 1890C
Conditioning process complete.
Initiating auto-cool at 2.0A/min for the TGHT and 1.0A/min for the TBHT.
Monday, June 26, 2017, 10:51
Target vented in air and removed from evap2 today.
Endcaps inserted.
Target looks good!
|
Attachment 1: Ta#53.JPG
|
|
388
|
Friday, September 15, 2017, 10:56 |
Laura Lambert | Ta | 42218-10 | HP-SIS | Done | Conditioning Ta#54 | Friday, September 15, 2017, 09:44
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
1 long Ta Heat shield on each side, not incl center block.
No endcaps inserted, no Rh foil inserted.
Loaded into evap2 yesterday.
Chamber pumped down overnight.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 650A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
HS water valves were already open.
Tapped up manually to 40A, vacuum stable.
IGP1 = 1.1e-6 Torr
IGP2 = 7.8e-7 Torr
Initiating auto-ramp.
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
Monday, September 18, 2017, 08:38
TGHT = 647A, 10.04V
TBHT = 233A, 3.51V
IGP1 = 4.65e-7 Torr
IGP2 = 3.78e-7 Torr
OMEGA = 1700C
Increasing max setpoint of TGHT to 750A
Monday, September 18, 2017, 14:49
TGHT = 760A, 11.96V
TBHT = 233A, 3.54V
IGP1 = 8.9e-7 Torr
IGP2 = 8.6e-7 Torr
OMEGA = 1905C
Conditioning process complete.
Initiating auto-cool at 2.0A/min for the TGHT and 1.0A/min for the TBHT.
Tuesday, September 19, 2017, 10:38
Target was cooled down in sections so Yasser could take some temperature measurements with his thermocouples.
Vented in air and removed from evap2 this morning.
Target looks good.
Endcaps inserted and expanded.
Inserting Rh foil this afternoon.
Tuesday, September 26, 2017, 10:53
Tapped up manually to 230A over the course of ~35min.
TBHT striptool = 228A, 0.33V
TBHT direct readout = 230.4A, 0.33V
Vacuum good/ stable.
Minor spike to IGP1 = 1.5e-5 Torr ~5min after reached max setpoint of 230A.
IGP1 striptool = 3e-6 Torr
IGP1 direct readout = 3.79e-6 mBar
Initiating auto-cool at 2.0A/min.
|
Attachment 1: Capture.JPG
|
|
404
|
Tuesday, April 17, 2018, 10:24 |
Laura Lambert | Ta | 41177-3 | LP-SIS | Done | Conditioning Ta#56 back-up target/ Temp measurements for Aurelia | Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
No Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber pumped down over night.
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 6.5e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
TGHT will be ramped up to 300A at 1.0A/min.
Aurelia will take over for temp measurements.
Final desired temperature = 1900C
Vacuum limit stop at 3.0e-5 Torr, backing off at 8.0e-5 Torr.
Thursday, April 19, 2018, 08:39
First round of temperature measurements complete.
Reached a max current of 600A, ~1700C
Cooled down overnight.
Will remove from evap2, insert endcaps, and load back in for more measurements.
Thursday, April 19, 2018, 12:35
Vented in air and removed from evap2.
See next elog for follow up temperature measurements.
|
|