Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 5 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  54   Friday, January 11, 2013, 14:00 John WongEmptyTa-Target boat DoneTesting QMS & thermocouples Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with
 evap2_thermocouple_setup.PNGQMS_temperature_setup.PNG008_all_temp.png018.png022.png 
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0 Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS.  The container will be
  
  287   Thursday, March 24, 2016, 12:05 John WongSiC TARGET BOATDoneTest#3: E-spin SiC with PANThursday, March 24, 2016, 11:37  
SiC powder (<1um) [10%] was mixed
with PAN solution [10%].  Solution was
 Screen_Shot_2016-03-26_at_3.39.35_PM.pngTGHT_faulty.PNG 
  252   Thursday, October 08, 2015, 12:26 John WongEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR

    

       
            
 Test_2_tempcurves.PNGTest1&2_IV_temp_.png 
  265   Tuesday, December 01, 2015, 11:35 Anders MjosEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR Data from thermocouple attached.
Raw data and Excel sheet with plot.
 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx 
  278   Friday, February 26, 2016, 16:02 John Wongnp-SiC TARGET BOATDoneTest#2: Carbonizing sol-gel TEOS + Pan nanofibersFriday, February 26, 2016, 15:44
5 samples were prepared at UBC MTRL
using Sol-gel tetraethyl orthosilicate (TEOS)
  
  251   Tuesday, October 06, 2015, 15:18 John WongEmpty41077-5LP-SISIn progressTest#1: Measuring temp with thermocouple (centre) & 2C-IR

    

       
            
 Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG 
  233   Friday, July 31, 2015, 15:51 John WongTa TARGET BOATIn progressTest for homogeneity: Sintering TaC coating on a Ta tube Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The
inner of the tube was filled with TaC solution
 Screen_Shot_2015-07-31_at_3.46.10_PM.png 
  234   Tuesday, August 04, 2015, 12:04 Laura LambertTa TARGET BOATDoneTest for homogeneity: Sintering TaC coating on a Ta tube

    

       
            
 Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg 
  443   Tuesday, May 14, 2019, 13:57 Aaron Schmidt  LP-FEBIADDoneTest FEBIAD Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.)
  
  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
  
  332   Saturday, October 15, 2016, 12:42 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  333   Sunday, October 16, 2016, 17:55 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  334   Tuesday, October 18, 2016, 09:23 Laura LambertTa41790-5LP-SISDoneTemperature measurements for Ta#50

    

       
            
  
  401   Monday, February 19, 2018, 14:16 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into
  
  403   Thursday, March 08, 2018, 11:05 Marla CervantesEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL  Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2
  
  394   Wednesday, November 29, 2017, 16:18 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today
and currently pumping down.
  
  400   Wednesday, December 13, 2017, 10:55 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2
  
  268   Thursday, January 07, 2016, 09:19 Aurelia LaxdalTa41369-5HP-SISIn progressTemperature measurementsTemperature measurements in progress this
week for Ta HP-SIS.
See attachment for the current settings
 Jan_9_and_10_2016_measurements.docx 
ELOG V2.9.2-2455