  364   Monday, May 08, 2017, 10:05 Laura Lambert   MaintenanceTurbo pump control box replaced Monday, May 08, 2017, 10:05
Turbo pump control box died last
week.
  
  369   Thursday, May 11, 2017, 11:30 Laura Lambert   MaintenanceNew Ion Gauge for IGP2 Thursday, May 11, 2017, 11:25
IGP2 has been having problems where
sometimes it turns off and requires simply
  
  379   Tuesday, July 18, 2017, 15:30 Laura Lambert   MaintenancePaddle wheel replacement for all evap2 water supplies Tuesday, July 18, 2017, 15:26
Problems occured with TGHT water
supply paddle wheel stopped and therefore
  
  399   Monday, December 11, 2017, 14:22 Laura Lambert   MaintenanceInterlock limits updated to 500mTorr Monday, December 11, 2017, 14:21
Dave updated evap2 interlock limits
to 500mTorr for TGHT and TBHT on friday
  
  475   Wednesday, March 04, 2020, 14:33 Aaron Schmidt   MaintenancePS swap out The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: 
  
  571   Tuesday, April 12, 2022, 13:41 Aaron Schmidt   MaintenanceNew Flex - line HS installedOld HS sprang a leak in the copper tubing.  
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. 
  
  575   Tuesday, May 10, 2022, 14:43 Aaron Schmidt   MaintenanceActive TP removed / Swap / Slow start TP Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from
  
  80   Thursday, August 08, 2013, 15:41 Laura LambertNiO39530-6HP-FEBIADIn progressSintering NiO # 2Thursday, August 08, 2013, 15:19
NiO target materials loaded into
the container yesterday.
 NiO#2.PNG 
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
 No Ta-heat shields are used.
  
  98   Thursday, January 16, 2014, 13:06 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  100   Friday, January 17, 2014, 10:18 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  101   Friday, January 17, 2014, 12:52 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  111   Friday, January 24, 2014, 14:25 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  112   Monday, January 27, 2014, 10:59 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  113   Tuesday, January 28, 2014, 11:57 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
 IMG_20140128_111526059.jpgIMG_20140128_111456815.jpg 
  121   Friday, March 07, 2014, 11:46 Laura Lambert 40282-3TARGET BOATIn progressSintering TaC coated end caps Friday, March 07, 2014, 11:41
The target container end-caps were
sintered previously, but did not fully complete
  
  125   Friday, March 21, 2014, 16:18 John WongTiC38817-8HP-SISIn progressSintering TiC  Friday, March 21, 2014, 16:09
Target container is loaded with 360
Discs of TiC.  
  