  499   Tuesday, August 18, 2020, 09:26 Marla CervantesTaC44489-15TARGET BOATDoneTaC coating/sintering  Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta,
  
  500   Tuesday, August 18, 2020, 10:41 Marla CervantesTaC44489-11 DoneTaC coating/sintering Thursday, August 19, 2020, 17:28
 A short tantalum tube
  
  501   Saturday, August 22, 2020, 11:44 Marla Cervantes 44489-11 DoneC-Cartridge test#1Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge
  
  502   Wednesday, August 26, 2020, 10:27 Marla Cervantes 44489-8 DoneC-Cartridge test #2 Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with
  
  503   Sunday, August 30, 2020, 18:28 Marla CervantesEmpty44489-13 DoneTaC coating/sintering Sunday, August 30, 2020, 06:47
A short tantalum tube was coated
  
  504   Monday, August 31, 2020, 12:57 Marla Cervantes 44489-15  DoneTaC coating heating test Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under
  
  505   Saturday, September 05, 2020, 21:33 Marla CervantesEmpty  DonePristine Ta tube calibrationSaturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3
  
  507   Thursday, September 17, 2020, 16:11 Marla CervantesEmpty44139-9LP-SISDoneTaC coating/sintering Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2
  
  508   Monday, September 21, 2020, 17:01 Marla Cervantes 44139-8-SKTARGET BOATDoneConditioning graphite target #3 Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the
 Voltage-Increment.JPGConditioning-C-3.JPG 
  525   Tuesday, November 24, 2020, 12:56 Marla Cervantes 44139-8-SK TARGET BOATDoneGraphite casting conditioningTuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum
 2020-11-24-IGP1.JPG2020-11-24IGP1-zoom_out.png2020-11-24-IGP1-stable.JPG2020-11-24-ConditioningProcess.JPG 
  528   Thursday, February 11, 2021, 10:57 Marla Cervantes NA DoneRe coating Test 1Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate
it and deposit a layer of Re on the inner
  
  530   Tuesday, February 23, 2021, 08:59 Marla Cervantes NA (Cu-tube) DoneRe coating Test 2 Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed
and when dry it was installed in the EVAP2,
  
  538   Tuesday, March 23, 2021, 11:28 Marla CervantesEmpty44489-6 DoneRe-coating test 3Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result:
  
  540   Thursday, March 25, 2021, 11:24 Marla CervantesEmptyNA (Cu-Tube DoneRe-coat test 4Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result:
  
  541   Friday, March 26, 2021, 13:58 Marla CervantesEmpty44489-6 DoneRe-coat 1Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2.
  
  542   Friday, March 26, 2021, 16:23 Marla CervantesEmpty44489-7 DoneRe-coat 2Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats
  
  543   Sunday, March 28, 2021, 11:24 Marla Cervantes NA (Ta-tube) DoneRe-coat 3Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats
  
  547   Tuesday, April 13, 2021, 10:44 Marla CervantesEmptyNA (Ta- tube Eagle Alloys) DoneRe-coat 4 Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr

 voltage-increment-Re-coating.JPG 
  548   Thursday, April 15, 2021, 18:33 Marla CervantesTa44139-6-SKTARGET BOATDoneCarbon penetration on TaThursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the
 Ta-samples_heating.JPG 
  669   Thursday, August 08, 2024, 11:17 Marla CervantesC44139-5 SKLP TUBEDoneGraphite foils conditioning

    

       
            
 GraphiteFoil-Conditioning-EVAP2.JPG 