48
|
Wednesday, September 26, 2012, 15:06 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating |
Nikita Bernier wrote: |
Nikita Bernier wrote: |
Monday, September 24, 2012, 15:01
The target boat with TaC coating is being used again. The inside of the boat is covered with a 0.002 inches thick Ta foil with TaC coating, wrapped with a 0.002 inches thick Ta foil.
Chamber was pumped down to 6e-6 Torr before the Heat Shield cooling water valve was opened. A small vacuum bump was detected (See attachment #1). It is not clear if it was caused by a water leak or not.
After consulting with Peter, I will wait for the vacuum to be below e-07 Torr before turning the target heater on.
|
Monday, September 24, 2012, 18:02
The vacuum was stable until 1e-06 Torr. The target heater was turned on and tapped up to 60 A (0.8 V).
Evaporator #2 is now auto-ramping overnight at 0.2 A/min, up to 800-850 A, with the maximum voltage limited at 14 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum).
Tuesday, September 25, 2012, 15:11
Sintering process is going smoothly. See Attachment 1. The auto-ramping was increased to 1 A/min up to 800-850 A.
Tuesday, September 25, 2012, 16:11
And the voltage limit was increased to 18 V ! See Attachment 2.
Tuesday, September 25, 2012, 19:13
Around 806 A (readback), voltage increased more quickly than the current. It seems like resistance is building up. After reaching 836 A (readback), the current was tapped down to 800 A (readback)/ 816 A (setting) in an effort to save the Ta boat. See Attachment 3. The current will stay at 800 A for ~4 hours before ramping down.
|
Wednesday, September 26, 2012, 14:31
The current was tapped down twice as resistance was building up. After 4 hours at ~800 A, the TGHT was ramped down at 2 A/min. See Attachment 1. The target boat was cooled down for 4 hours before the chiller was turned off.
Also I had trouble measuring the temperature. I was unable to get a clear picture with the pyrometer. Therefore the exact temperature remains unknown, but from previous experiments, 800 A was about 1400°C.
The TaC coated Ta foil is very brittle. There is a lot of crystallisation on the Ta boat. See attachment 2. It is unlikely that the boat would survive many more sintering. Therefore it will be used for BeO pellets tests.
When John gets back, I suggest we use a new boat coated with TaC, without additional layers. (See message #15 when this target boat was sintered up to 900A (local 893A/16.88V), Measured temp @ 1500°C)
|
Attachment 1: striptool6.png
|
|
Attachment 2: Sans_titre2.png
|
|
|
95
|
Wednesday, November 06, 2013, 17:36 |
John Wong | TaC | Target Boat #2 | | In progress | Testing TaC matrix coating | The purpose of this experiment is to improve the TaC coating mixed with other metals as additives. The coating solution will be sprayed on Ta metal (0.015" thick, same thickness as the target container).
The samples will be sintered at ~ 1800C. Once the process is completed, a graphite tube will be inserted into the tube, and then re-heated it up to 1800C.
This test will show how good the protective layer to prevent the graphite to react with the Ta metal.
Wednesday, November 06, 2013, 17:11
Step #1
Two samples:
1. A short tube (same diameter as the usual container)
2. A cross section of the tube.
Both samples are coated with the TaC matrix spray:
0.05 moles TaC
0.005 moles of Mo2C, VC, Cr3C2, NbC
A Rh foil is used as a protective under layer.
see links for pictures: https://www.dropbox.com/sh/866zsp44nnjeg2z/LqCThu-G_0
The target boat is wrapped with 3 layers of heat shields.
Samples will be heated up to 600A ~1800C
Chamber is currently being pumped down.
Friday, November 08, 2013, 17:13
Chamber was pumped down to ~2e-6 Torr. HS water valve is opened and no leaks were detected.
TGHT will be ramped up to 580A at 1A/min.
Monday, November 11, 2013, 08:10
TGHT has reached to 580A; samples has been heated at that current for over the weekend.
IGP2 currently at 3.5e-7 Torr.
Auto cooling initiated, ramping rate at -2.0A/min.
Step 2:
The coated tube is sintered with TaC-matrix.
The graphite tube is inserted in the tube and will be heated back up; see link for details:
https://www.dropbox.com/sh/ji0rhlj0v1tfj1w/cRv1I3VJXE
Chamber is currently pumped down to 1.8e-6 Torr.
TGHT will first be ramped up to 450A (1A/min) to see how the reaction behaves, then a caution ramp up to 600A will take place.
Friday, November 15, 2013, 11:04
TGHT reached to 450A. Cooling down to 0A. Chamber will be vented for inspection.
Monday, November 18, 2013, 17:22
Continue Step#2:
The sample looks ok after heating at 450A.
Re-heating it to 500A.
Chamber has been pumped down to 4.0e-6 Torr.
Initiated auto-ramping...
|
|
420
|
Thursday, October 25, 2018, 15:37 |
Marla Cervantes | TaC | 43044-7 | LP-SIS | Done | TaC coating/sintering for graphite insert test | Thursday, October 25, 2018, 10:36
Container is coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
Chamber is currently being pumped down
Friday, October 26, 2018, 08:40
Pressure at IGP1 1.06e-6 Torr.
Tapped up TGHT and TBHT manually to 40 A
Waited 1 hr for vacuum to stabilize.
IGP1 = 8.9e-6 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Initiating auto ramp for TGHT @ 1 A/min to a max setpoint of 350 A
Initiating auto ramp for TBHT @ 0.5 A/min to a max setpoint of 230 A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900 C
Friday, October 26, 2018, 10:46
At 62 A, the vacuum overpassed the "Bad vacuum " limit and the current reduced to 54 A.
when the pressure returned to the "Good vac" limit the ramping started automatically.
Friday, October 26, 2018, 16:59
TGHT= 450 A, Temperature = 1878 C
Ramping rate increased to 1A/min for the TBHT.
Tapped manually to 454 A, Temperature 1880 C.
Saturday, October 27 2018, 10:00
Ramping down to 0 A @ 2 A/min.
Monday, October 29, 2018, 12:39
Venting EVAP2, TaC coat sintering completed. |
Attachment 1: 181027-TaContainer-sintering.jpg
|
|
|
421
|
Wednesday, October 31, 2018, 19:35 |
Marla Cervantes | TaC | 39530-1 | LP-FEBIAD | Done | TaC coating/sintering for graphite insert test | Wednesday, October 31, 2018, 19:35
Container is coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
Chamber is currently being pumped down
Thursday, November 01, 2018, 10:31
Pressure at IGP1 9.44e-7 Torr.
Tapped up TGHT and TBHT manually to 40 A
Thursday, November 01, 2018, 12:32
Waited ~1 hr for vacuum to stabilize.
IGP1 = 1.42e-6 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Initiating auto ramp for TGHT @ 1 A/min to a max setpoint of 350 A
Initiating auto ramp for TBHT @ 0.5 A/min to a max setpoint of 230 A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900 C
Tapped manually to 445 A, Temperature 1896 C.
Friday, November 02, 2018, 07:35
TGHT 7.86 V 445.6 A
TBHT 3.22 V 233.3 A
IGP1 1e-6 Torr
Ramping down TGHT and TBHT to 0 A @ 2 A/min.
Friday, November 02, 2018, 17:28
Monday, October 29, 2018, 12:39
Venting EVAP2, TaC coat sintering completed. |
Attachment 1: Capture.JPG
|
|
Attachment 2: Coating.jpg
|
|
|
426
|
Wednesday, January 16, 2019, 11:53 |
Marla Cervantes | TaC | 43630-2 | | Done | TaC coating/sintering for graphite insert test | Tuesday, January 15, 2018, 17:30
Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
EVAP2 currently pumping down.
Pressure at IGP1 4.71 -7 Torr.
Tapped up TGHT manually to 40 A
Waited ~1 hr for vacuum to stabilize.
IGP1 = 9.96-7 Torr
Good vac at 3.00e-5 Torr
Bad vac at 5.00e-5 Torr.
Initiating auto ramp for TGHT @ 1 A/min to a max set point of 350 A
Once max set points achieved, will tap up manually to final desired temperature of 1900 C
Thursday, January 17, 2019, 15:31
The tube remained at ~1900 C for 6 hours.
IGP1=5.8e-7 Torr
TGHT = 427 A, 7.23 V
Min Temperature = 1890 C
Thursday, January 17, 2019, 15:33
Auto-ramp set to TGHT 0 A @ -2 A/min. |
|
436
|
Wednesday, April 03, 2019, 16:59 |
Marla Cervantes | TaC | 43630-5 | | Done | TaC coating/sintering for graphite insert test | Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V).
EVAP2 currently pumping down.
Thursday, April 04, 2019, 05:12
IGP1 = 4.5e-7 Torr
The current is tapped manually to 40 A
After1 hour IGP1 = 1.18e-6 Torr, the autoramp was set to 1 A/min to 400 A
Thursday, April 04, 2019, 18:58
After 4 hours at ~1900 C:
IGP1 = 6.13e-7 Torr
TGHT = 6.74 V, 416.06 A |
|
461
|
Thursday, October 03, 2019, 09:26 |
Darwin Ortiz Rosales | TaC | 44062-6 | LP-SIS | Done | TaC coating/sintering | Thursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 427 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down previous night.
IGP1= 7.81e-07 Torr
Manually tapping up to ~40A on both TGHT and TBHT at ~1A/min
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Thursday, October 03, 2019, 09:21
Manually tapped to 50A on TGHT and TBHT
Will allow pressure to stabilize and begin autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
autoramp increments might be increased to 2A/min depending on stability of system.
Thursday, October 03, 2019, 10:00
TGHT = 51.6A, 0.36V
TBHT = 49.5A, 0.62V
IGP1=9.6e-7 Torr
Starting autoramp at 1A/min to a max of 400A for TGHT and 230A for TBHT. Will monitor and increase ramp increments to 2A/min if stable.
Thursday, October 03, 2019, 11:09
TGHT = 103A, TBHT=97A
IGP1=9.1e-06 Torr and dropping
Will increase autoramp increments to 2A/min
Thursday, October 03, 2019, 11:41
With TGHT = 148A, 1.9V and TBHT = 141A, 2.3V
IGP1= 7.9e-6 Torr
Autoramp was increased to 3A/min
Thursday, October 03, 2019, 13:45
TGHT=401A, 6.9V
TBHT=233A, 4.2V
IGP1= 1.14e-05Torr
OMEGA = 1874
begin manual ramp to 1900C
(Temperature dropping as pressure drops)
Thursday, October 03, 2019, 14:11
TGHT= 416A, 7.1V
TBHT=233A, 4.2V
OMEGA = 1900 C
IGP1= 6.9e-06 Torr and trending down
Thursday, October 03, 2019, 15:24
TGHT manually bumped to 421A, 7.2 V because temperature dropped slightly.
Thursday, October 03, 2019, 19:00
TGHT manually increased to 425A, 7.3V
Thursday, October 03, 2019, 19:12
TGHT = 424.9A, 7.3V
TBHT=233.2A, 4.1V
OMEGA= 1897 C
IGPA=1.45e-06 Torr
Starting ramp-down at -1A/min on TGHT and 0.5A/min on TBHT
Friday, October 04, 2019, 11:34
Container taken out.
|
|
462
|
Monday, October 07, 2019, 09:18 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | In progress | Sintering TaC coating on endcaps and springs | Friday, October 04, 2019, 11:37
Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.
There are also 3 coated springs, one in between endcaps and two on either end
The boat is wrapped with 2-layers of Ta heatshields.
Chamber pumping down
OMEGA slope = 0.99
Will Tap TGHT up manually to 40 A then autoramp to 400A at 1A/min.
Final desired temperature on OMEGA (tap)= 1800C
Monday, October 07, 2019, 09:08
Sunday night heating started at 1A/ min on TGHT to 54 A
heating paused for 1 hour to allow IGP1 to equillibrate. Then restarted at 1A/min to 400A as planned.
This morning IGP1 = 1.3e-06 Torr
TGHT = 401A, 4.2V
OMEGA = 1550 C
Monday, October 07, 2019, 09:36
manually tapping to 1800 C
Monday, October 07, 2019, 14:09
Temperature @ ~1800 for 3.5 hours
TGHT= 495.4, 9.2 V
IGP1= 1.1e-06 Torr Pressure Steady there begin cooling
Cooling @ -2A/min
|
|
464
|
Thursday, October 17, 2019, 13:53 |
Darwin Ortiz Rosales | TaC | 44062-3 | LP-SIS | In progress | TaC coating/sintering | Thursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1= 7.0 e-07 Torr
Thursday, October 17, 2019, 13:53
After pressure stabilization at 40A:
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Friday, October 18, 2019, 6:20
TGHT = 400A, 6.52V, TBHT= 233A, 4.1V
OMEGA = 1733C
Start autoramp to 430A on TGHT at 1A/min
Friday, October 18, 2019, 7:05
TGHT= 431A, 7.1V
TBHT= 233A, 4.1V
IGP1= 1.13e-06 Torr
OMEGA = 1828 C
Set autoramp to 465 at 1A/min
Friday, October 18, 2019, 11:13
TGHT = 465A, 7.8V, TBHT = 233A, 4.1V
OMEGA = 1865C
(Something is different with the heat dissipation on this target. Will leave at this current and start cooling at 1200 noon to avoid container strain)
Friday, October 18, 2019, 12:00
TGHT = 462.7A, 7.8V
TBHT= 233.4A, 4.1V
OMEGA = 1863C
IPG1= 1.02e-06 Torr
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Monday, October 21, 2019, 09:11
Pump down and dismount.
|
|
468
|
Friday, November 22, 2019, 18:32 |
Fernando Maldonado & Marla Cervantes | TaC | | HP-FEBIAD | In progress | TaC coating/sintering | Friday, November 22, 2019, 18:18:
Friday, November 22, 2019, 18:18: Roughing
Friday, November 22, 2019, 18:23: Turbo on .
Friday, November 22, 2019, 18:32: Turbo at speed
|
|
469
|
Saturday, November 23, 2019, 14:03 |
Darwin Ortiz Rosales | TaC | 42464-3 | HP-FEBIAD | Done | TaC coating/sintering | 12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down was started on Friday November 22; however.
No leaks were observed when turning water lines on.
IGP1= 4.6e-07 Torr
Saturday, November 23, 2019, 15:30
autoramp at 0.5A /min up to 50A for both TGHT and TBHT and maintained for 1 hour.
Saturday, November 23, 2019, 16:15
IGP1= 1.1e-06 Torr
Auto Ramp to 450 A on THGT and 230A on TBHT at 0.5A/min
Saturday, November 23, 2019, 23:44
IGP1= 5.2e-06 Torr
TGHT = 248A, 2.9V TBHT= 233A 2.9V
Increased ramp step to 1A/min to 620 A
Sunday, November 24, 2019, 00:14
IGP1=1.9e-06 Torr
TGHT = 274.3, 3.3V TBHT= 233A, 2.9V
Sunday, November 24, 2019, 07:33
IGP1=3.2e-06 Torr
OMEGA= 1490C
TGHT = 619 A, 9.1V TBHT=233A, 2.9V
Continue ramping THGT at 1A/min to 700 A
Sunday, November 24, 2019, 10:05
IGP1= 2.1 e-05 Torr
OMEGA= 1676 C
TGHT= 700A, 10.6V TBHT= 233A, 2.0V
Start autoramp to 780A as per regression in attachment
Sunday, November 24, 2019, 13:22
Autoramp to 795A for TGHT
Sunday, November 24, 2019, 21:16
OMEGA= 1854 C
TGHT= 789.6A, 12.27V TBHT= 233.A, 2.9V
IGP1= 2.0e-05
Will allow pressure to stabilize lower.
Sunday, November 24, 2019, 22:16
TGHTT= 789.6A, 12.3V TBHT=233.3A, 2.9V
OMEGA=1855C
IGP1 = 6.9e-06Torr
Start cooling TGHT at 2A/min and TBHT at 1A/min |
Attachment 1: HPFIBIAD20191124.PNG
|
|
|
479
|
Wednesday, March 18, 2020, 07:21 |
Marla Cervantes | TaC | 44139-11 | LP-SIS | Done | TaC coating/sintering | Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial pressure IGP1 = 4.8e-7Torr
Wednesday, March 18, 2020, 09:29
After an hour pressure reduced to 5.45e-6 Torr
TGHT; 0.518 V, 40.5 A
TBHT: 0.41 V, 38.6 A
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Wednesday, March 18, 2020, 18:29
TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V
OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions
https://elog.triumf.ca/TIS/Evaporator_2/464
Start autoramp to 460A on TGHT at 1A/min
Wednesday, March 18, 2020, 20:51
TGHT: 464 A, 7.75 V
Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC
Wednesday, March 18, 2020, 23:17
After ~4 hours at 1317 degC according to the pyrometer:
TGHT = 7.7 V, 457.8 A,
TBHT = 3.9 V, 232.9 A,
IGP1 = 1.16e-6
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Thursday, March 19, 2020, 15:53
Venting and dismounting.
The coating does not have the quality to be used online, another LP-SIS will be coated and sinter |
Attachment 1: IMG_1538.JPG
|
|
|
499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Desired temperature= 1900 C,
Omega Slope set = 0.990,
IGP1 = 3.75e-7 Torr
Autoramp set to TGHT at 0.2 A/min to reach 52 A
Tuesday, August 18, 2020, 13:47
IGP1= 6.8e-7 Torr
TGHT =0 .511 V, 51.3 A
IGP1 = 6.8e-7 Torr
Autoramp set to TGHT at 0.5 A/min to reach 100 A
Tuesday, August 18, 2020, 20:39
IGP1 = 3.3e-7 Torr
Autoramp set to TGHT at 0.5 A/min to reach 430 A
Wednesday, August 19, 2020, 06:57
Autoramp stopped at 402 A
IGP1 = 1.12e-6 Torr
TGHT = 5.6 V, 403.65 A
Autoramp set to TGHT at 1 A/min to reach 500 A
Wednesday, August 19, 2020, 08:59
IGp1 = 1.7e-6 Torr
TGHT = 7.22 V, 500.34 A
After 30 min at 1900 °C, autoramp set to TGHT at -1 A/min to reach 450 A, the ramp will be stopped when the temperature reads 1850 °C
Autoramp stopped at 1845 °C
IGP1 = 1.17e-6 Torr
TGHT = 6.8 V, 472.95 A |
|
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Desired temperature= 1900 C,
Omega Slope set = 0.990,
Thursday, August 20, 2020, 17:29
IGP1 = 4.25 e-7 Torr
Autoramp set to 0.5A/min to 400 A
Thursday, August 20, 2020, 20:36
IGP1 = 6.78e-7 Torr
TGHT = 267.7 A, 3.28 V
Autoramp set to 0.4 A/min to 450 A
Friday, August 21, 2020, 10:28
IGP1=7.23e-7 torr
TGHT = 6.3 v, 446.3 A
Omega = 1603 °C
Autoramp set to -5 A/min |
|
533
|
Tuesday, March 02, 2021, 11:32 |
Darwin Ortiz Rosales | TaC | 44691-5 | LP-SIS | Done | TaC coating/sintering | Tuesday, March 02, 2021, 11:26
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 433.8 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over night.
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Wednesday, March 03, 2021, 13:28
IGP1 = 4.0 e-7 Torr
Start ramping @ 1A/min to 20A on both TGHT and TBHT
Wednesday, March 03, 2021, 15:03
Start ramping @1/min to 60A on Both TGHT and TBHT
Wednesday, March 03, 2021, 22:42
TGHT = 60A, TBHT = 60A
IGP1= 4.2 e-7 stable
Start ramping to 400A @ .5A/min for TGHT and @0.5A/min for TBHT to 230A
Thursday, March 04, 2021, 11:56
TGHT = 400 A, TBHT =230A
IGP1= 1.9e-6 Torr
OMEGA = 1695 C
Continue ramp up @0.5A/min to 430A on TGHT
Thursday, March 04, 2021, 14:02
IGP1 = 1.87e-6 Torr
TGHT = 434 A , 7.2 V
OMEGA = 1787 C
Will tap up manually 450A @ on TGHT and leave at that current for ~4 hours
Thursday, March 04, 2021, 19:35
After ~ 5 hours at 1829 C max OMEGA reading
OMEGA = 815 C
Start ramp down at 1A/min on TGHT and 0.8A/min for TBHT
IGP1= 1.2e-6 Torr
|
|
534
|
Friday, March 05, 2021, 10:48 |
Darwin Ortiz Rosales | TaC | 44691-1 | LP-SIS | Done | TaC coating/sintering | Friday, March 05, 2021, 10:47
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 431.0 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over night.
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Saturday, March 06, 2021, 10:29
IGP1= 2.7 e-07 Torr and stable
AutoRamp at 1A/min to 40 A on TGHT and TBHT
Saturday, March 06, 2021, 22:36
IGP1= 2.2e-07 Torr
TGHT = 40.3 A, .46V
TBHT = 38.48 A, .48 V (set to 40 A)
Start Autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT
Sunday, March 07, 2021, 07:48
IGP1=8.5e-7 Torr
TGHT = 287 A, 4.6V
TBHT = 232 A, 4.0 V
OMEGA = 1493C
Increase ramp speed on TGHT to 2A/min to 400A
Sunday, March 07, 2021, 08:36
IGP1=1.7 e-06 Torr
TGHT = 373.7 A, 6.3V
TBHT = 232.9 A, 4.1 V
OMEGA = 1752 C
Sunday, March 07, 2021, 08:53
IGP1= 1.7e-06 Torr
TGHT = 400 A, 6.8 V
TBHT = 232.8 A, 4.1 V
OMEGA= 1842
Ramp TGHT @ 2A/min to 420 A as per attached current approximation
Sunday, March 07, 2021, 09:25
OMEGA=1915 C
TGHT = 420A, 7.2V
TBHT= 232.8 A, 4.1V
IGP1= 1.6 e-06 Torr
Tap down manually to approx 1900 C
TGHT = 412.9 A, 7.0 V and OMEGA=1900 C
Will leave for about 4 hours at this temperature
Sunday, March 07, 2021, 13:05
IGP1= 1.1 e-06 Torr
TGHT = 415 A, 7.2 V
TBHT = 232.8 A, 4.1 V
OMEGA = 1880C
Start cool down at -2A/min on TGHT and -1A/min TBHT
|
Attachment 1: 2021-03-07_090107-44691-1_Tac_Sintering.png
|
|
|
535
|
Tuesday, March 09, 2021, 11:54 |
Darwin Ortiz Rosales | TaC | 42464-1 | HP-FEBIAD | Done | TaC coating/sintering | Tuesday, March 09, 2021, 11:54
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be increased accordingly to reach desired Temp.
TBHT will be set fixed at 230 A max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Wednesday, March 10, 2021, 08:32
IGP1 = 2.6 e -07 Torr
Start autoramp @ 1A/min to 40 A on both TGHT and TBHT
***Autoramp aborted due to work on EF12 affecting EVAP2***
Will have to resume Thursday or Friday
Saturday, March 13, 2021, 7:54
IGP1= 3.8e-07 Torr
Initiate heating @ 0.5A/min TBHT and TGHT to 60 A
Saturday, March 13, 2021, 23:01
IGP1 = 2.7e-07Torr
TGHT = 60.5A, 0.7V
TBHT= 60.0A, 0.7V
Initiate ramp @ 1 a/min to 400 A on TGHT and 230A on TBHT
Sunday, March 14, 2021, 08:45
IGP1= 8.2e-07 Torr
TGHT = 400A, 5.6V
TBHT = 232.9A, 3.0V
OMEGA = 1142 C
Continue ramping to 460 A on TGHT at 1a/min
Sunday, March 14, 2021, 10:11
IGP1 = 1.0 e-06 Torr
TGHT= 460.4 A, 6.5 V
TBHT = 232.9 A, 3.0 V
OMEGA = 1239 C
Will ramp up to 500 A at 1a/min on TGHT
Sunday, March 14, 2021, 10:53
IGP1 = 1.3 e-06 Torr
TGHT= 495 A, 7.2 V
TBHT = 232.9 A, 3.0 V
OMEGA = 1316 C
Will ramp up to 600 A at 1a/min on TGHT
Sunday, March 14, 2021, 12:45
IGP1 = 3.0 e-06 Torr
TGHT= 604 A, 9.1 V
TBHT = 232.9 A, 3.1 V
OMEGA = 1610 C
Will ramp up to 660 A at 1a/min on TGHT
Sunday, March 14, 2021, 17:01
IGP1= 2.4e-06 Torr
TGHT = 664 A, 10V
TBHT = 232.9 A, 3.1V
OMEGA = 1733 C
tapping TGHT to 740 A
OMEGA = 1883 C
Sunday, March 14, 2021, 21:45
IGP1= 3.1e-06 Torr
TGHT = 744A, 11.5V
TBHT = 232.9 A, 3.2V
OMEGA = 1875 C
Start cooling TGHT @-3A/min and TBHT @-1A/min
|
|
536
|
Tuesday, March 16, 2021, 08:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | sintering of TaC on Caps and springs | Tuesday, March 16, 2021, 08:28
Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.
There are also 4 coated springs, one in between endcaps and three on the ends
The boat is wrapped with 3-layers of Ta heatshields.
Chamber pumping down
OMEGA slope = 0.99
Will ramp TGHT up to 40 A then autoramp to 400A at 1A/min.
Final desired temperature on OMEGA (tap)= 1800C
Tuesday, March 16, 2021, 11:22
IGP1= 3.5e-06 Torr
TGHT = 40A, 0.4V
Will ramp up at 1A/min to 400 A
Wednesday, March 17, 2021, 08:06
IGP1= 2.98 e-07 Torr
TGHT = 400 A, 4.3V
OMEGA shows no temperature reading. Will ramp up to 450A at 1A/min
Wednesday, March 17, 2021, 08:58
OMEGA still shows no reading
IGP1= 4.2e-07 Torr
ramping to 470A @ 1A/min
Wednesday, March 17, 2021, 09:21
OMEGA no reading
IGP1 = 4.4 e-07 Torr
TGHT = 470 A, 5V
ramp up to 490 A at 1A/min
Wednesday, March 17, 2021, 11:05
TGHT at 490 A, 5.2 V since 10 am. Will start cooling at 2 pm.
Wednesday, March 17, 2021, 13:47
TGHT = 493A, 5.3V
IGP1= 3.2e-07 Torr and stable
Start ramp down at -2A/min
Thursday, March 18, 2021, 11:20
The boat was dismounted but the materials had not sintered properly. The boat looked very twisted. Everything was transferred to a new boat with uncoated Ta caps at either end.
It was left overnight to establish vacuum.
Friday, March 19, 2021, 08:23
IGP1= 2.2 e-07 Torr
initiate heating at 1A/min on TGHT to 60 A
Friday, March 19, 2021, 10:04
IGP1= 3.6 e-07 Torr
TGHT = 60 A, .73 V
Ramp up to 450 A @ 2A/min
Friday, March 19, 2021, 14:26
OMEGA 1895 at 455A, 8.4 V
manually ramp down to 1800C
OMEGA 1800C at 416A, 7.6V
will leave like that for 3 hours more
Friday, March 19, 2021, 17:12
OMEGA 1795 C
TGHT = 415A, 7.6V
IGP1= 6.8e-07 Torr
Start ramp down at -2A/min
Monday, March 22, 2021, 23:07
Marla removed from Evap 2. Sintering vwas very good. The container with Ta caps is better for sintering these pieces.
|
|
554
|
Thursday, September 02, 2021, 07:14 |
Darwin Ortiz Rosales | TaC | 44691-7 | LP-SIS | Done | TaC coating/sintering | Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down over previous night
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-4 Torr
IGP1=7.7e-07 Torr
Initiate autoramp to 50 A @ 1A/min
Thursday, September 02, 2021, 06:54
Stopped autoramp after reading email about EF-12 trip and compressed air issue. Reset to 0 A both TGHT and TBHT
Thursday, September 02, 2021, 12:01
Ispite of site compressed air issues, EVAP 2 has not tripped. Will manually increase current to40A for both TGHT and TBHT.
IGP1= 1.06 E-06 Torr.
Friday, September 03, 2021, 08:06
IGP1= 7.2e-07 Torr
TGHT= 43A, 0.5 V
TBHT= 41A, 0.48 V
Start autoramp at 1A/min to 90A on both TGHT and TBHT
Friday, September 03, 2021, 10:22
IGP1= 1.55 e-06 Torr
TGHT = 90.1 A, 1.1 V
TBHT= 90.0 A, 1.2 V
Continue ramp up at 1A/min to 400 A for TGHT and 230A for TBHT
Friday, September 03, 2021, 16:05
430A on TGHT will keep for four hours. OMEGA = 1856 C but according to regression should be 1900. will keep at this temp.
Friday, September 03, 2021, 21:11
OMEGA has been at 1875C for 4 hours. Will start ramp down @ -2A per minute for TGHT and -1A min for TBHT
TGHT = 430 A, 7.3 V (current actually fluctuates between 428 and 433 A since new power supply
TBHT = 233A, 4.0V (set to 230 but displays 233) |
Attachment 1: coating44691-7.PNG
|
|
|
558
|
Thursday, October 21, 2021, 09:58 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (10 caps and 2 springs) |
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in graphite foil.
2 TaC coated Ta springs .
All mounted inside a target boat with enclosed ends.
Good vacuum = 3.0 e-3 Torr
Bad vacuum = 5.0 e-2 Torr
Will heat up to 1800-1900 C and keep at Temp for four hours
OMEGA slope = 0.990
*Note that the turbo pump has been replaced and this is the first EVAP2 operation after replacement*
Thursday, October 21, 2021, 10:03
IGP1= 1.6 e-06 Torr
starting ramp up at 2 amp/min to 30 A on TGHT
Thursday, October 21, 2021, 10:46
Ramping to 40 A at 2A/min and will keep there for 20 minutes.
Thursday, October 21, 2021, 11:19
IGP1= 1.2e-05 Torr and dropping
Start ramp up to 400 A at 0.5A/min
Thursday, October 21, 2021, 18:58
Started ramping at 3A/min to 468A on TGHT
Thursday, October 21, 2021, 20:15
Current at 468. Will keep there until pressure low enough.
Friday, October 22, 2021, 05:50
IGP1= 8.9 e-06 Torr
Start ramp down at -2A/min
Monday, October 25, 2021, 11:47
Upon examination the caps and springs did not appeared coated. The camera was not online so the current used was based on previous elogs. It may have evaporated TaC due to over temperature.
The materials will be cleaned, recoated and resintered. |
|